預(yù)制綜合管廊推廣應(yīng)用研究
本文選題:城市綜合管廊 + 預(yù)制管廊; 參考:《北京建筑大學(xué)》2017年碩士論文
【摘要】:綜合管廊是指建設(shè)于城市的地下用于收容二類及以上城市工程管線的建筑物及附屬設(shè)施,且擁有完備的排水、照明、通訊、監(jiān)控等設(shè)施功能的地下管廊結(jié)構(gòu)。對于提高城市地下空間的利用率、方便溝內(nèi)各管線后期的養(yǎng)護、有效解決拉鏈路、減少城市視覺污染有著不可或缺的作用;對于提高城市供給能源的水平和確保城市運轉(zhuǎn)安全優(yōu)勢明顯。城市綜合管廊是城市建設(shè)現(xiàn)代化、科技化、集約化、高效化的標(biāo)志之一,國內(nèi)越來越多的大中型城市都試探性的開始綜合管廊的建設(shè)試驗、規(guī)劃和建設(shè)。受工程規(guī)模、管廊尺寸、地質(zhì)條件和使用功能的要求,目前投入建設(shè)和使用的綜合管廊形式主要分現(xiàn)澆和預(yù)制兩種。現(xiàn)澆是目前應(yīng)用較為廣泛的傳統(tǒng)結(jié)構(gòu)形式,施工工藝較為成熟。預(yù)制綜合管廊是近幾年新興的建設(shè)形式,具有施工周期短、結(jié)構(gòu)質(zhì)量好、材料用量省、對環(huán)境和生活影響小等優(yōu)勢,滿足建筑產(chǎn)業(yè)化和綠色化的要求,雖然在中國起步較晚,但已經(jīng)在多個大型工程中得到應(yīng)用。不過受多重因素的影響,預(yù)制綜合管廊缺少規(guī)范化的設(shè)計標(biāo)準(zhǔn)、相對應(yīng)的法律法規(guī)和管理制度也很不健全,所以在推廣應(yīng)用時面臨眾多問題。本文以國內(nèi)已經(jīng)完成的預(yù)制綜合管廊工程為背景,通過詳述我國對城市綜合管廊的扶持政策、現(xiàn)澆與預(yù)制兩種工法的適用范圍和優(yōu)缺點對比,找出預(yù)制綜合管廊推廣應(yīng)用中遇到的問題。本文的成果在于面對從規(guī)劃到管理這四個階段所存在問題給出的對策及建議,為加快預(yù)制綜合管廊的發(fā)展和積極推廣預(yù)制管廊的應(yīng)用提供參考意見。
[Abstract]:The integrated pipe gallery is a kind of underground pipe gallery structure which is built in the city and is used to accommodate the second class and above urban engineering pipeline and its auxiliary facilities, and has the function of drainage, lighting, communication, monitoring and other facilities.It can improve the utilization rate of urban underground space, facilitate the maintenance of every pipeline in the ditch, effectively solve the zipper road, and reduce the city visual pollution.To improve the level of urban energy supply and ensure the safety of urban operation advantages.Urban integrated pipe gallery is one of the symbols of modernization, science and technology, intensive and high efficiency of urban construction. More and more large and medium-sized cities in China have begun the construction experiment, planning and construction of comprehensive pipe corridor tentatively.Due to the requirements of engineering scale, pipe corridor size, geological conditions and operation function, the comprehensive pipe gallery forms are mainly divided into cast-in-place and prefabricated forms.Cast-in-place is a widely used traditional structure, construction technology is more mature.The prefabricated integrated pipe gallery is a new type of construction in recent years. It has the advantages of short construction period, good structure quality, low consumption of materials, small impact on environment and life, and meets the requirements of building industrialization and greening, although it started relatively late in China.But it has been used in many large projects.However, due to the influence of many factors, the prefabricated comprehensive pipe gallery lacks the standardized design standard, and the corresponding laws, regulations and management system are not perfect, so it is faced with many problems when popularizing and applying.In this paper, based on the prefabricated integrated pipe gallery project which has been completed in our country, through the detailed description of the supporting policy of our country to the city integrated pipe gallery, the scope of application and the advantages and disadvantages of the two methods of cast-in-situ and prefabrication are compared.Find out the problems encountered in the popularization and application of prefabricated integrated pipe gallery.The achievement of this paper lies in the countermeasures and suggestions in the four stages from planning to management, which provides reference for speeding up the development of prefabricated integrated pipe gallery and actively popularizing the application of prefabricated pipe gallery.
【學(xué)位授予單位】:北京建筑大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F283;TU990.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 滿莉;;PPP模式在東北地區(qū)城市基礎(chǔ)設(shè)施建設(shè)和經(jīng)濟發(fā)展中的作用[J];北方建筑;2016年01期
2 邢丞;張健;;城市綜合管廊特點及設(shè)計要點解析[J];科學(xué)家;2016年07期
3 于晨龍;張作慧;;國內(nèi)外城市地下綜合管廊的發(fā)展歷程及現(xiàn)狀[J];建設(shè)科技;2015年17期
4 畢波;;綜合管廊建設(shè)之我見[J];江蘇城市規(guī)劃;2015年06期
5 馬東玲;陳一民;;北京市地下綜合管廊規(guī)劃與架空線路入地探討[J];市政技術(shù);2014年05期
6 汪勝;;綜合管廊斷面型式選用分析[J];中國市政工程;2014年04期
7 ;積極推進(jìn)城市綜合管廊在市政基礎(chǔ)設(shè)施建設(shè)中的推廣與應(yīng)用——現(xiàn)階段我國地下綜合管廊發(fā)展應(yīng)用現(xiàn)狀調(diào)查[J];混凝土世界;2014年07期
8 梁薦;郝志成;;淺議城市地下綜合管廊發(fā)展現(xiàn)狀及應(yīng)對措施[J];城市建筑;2013年14期
9 陳饋;蔡建林;;城市地下綜合管廊發(fā)展現(xiàn)狀與對策[J];建筑機械化;2012年10期
10 童星寬;;預(yù)制箱涵代替現(xiàn)澆箱涵的可行性分析[J];混凝土世界;2012年08期
相關(guān)重要報紙文章 前1條
1 宋志宏;梁艦;馮海忠;;精準(zhǔn)把握政策 提前規(guī)劃統(tǒng)籌[N];政府采購信息報;2016年
相關(guān)博士學(xué)位論文 前1條
1 王波;城市地下空間開發(fā)利用問題的探索與實踐[D];中國地質(zhì)大學(xué)(北京);2013年
相關(guān)碩士學(xué)位論文 前4條
1 張鍇生;小窯灣國際商務(wù)區(qū)綜合管廊工程設(shè)計分析[D];大連理工大學(xué);2014年
2 張秋玲;公共管廊PPP投融資模式研究[D];北京建筑工程學(xué)院;2012年
3 孫云章;城市地下管線綜合管廊項目建設(shè)中的決策支持研究[D];上海交通大學(xué);2008年
4 宋志強;我國城市地下管線規(guī)劃管理問題研究[D];吉林大學(xué);2008年
,本文編號:1754740
本文鏈接:http://www.sikaile.net/jianzhugongchenglunwen/1754740.html