基于風(fēng)險因素自相關(guān)性的施工進(jìn)度風(fēng)險分析研究

發(fā)布時間:2018-03-28 14:19

  本文選題:進(jìn)度風(fēng)險 切入點(diǎn):風(fēng)險分析 出處:《南昌航空大學(xué)》2017年碩士論文


【摘要】:進(jìn)度作為工程項(xiàng)目管理的三大目標(biāo)之一,是項(xiàng)目管理的重要內(nèi)容。工程施工環(huán)境的開放性和復(fù)雜性,使得項(xiàng)目實(shí)施過程中常常受到外界不確定因素的干擾,從而導(dǎo)致施工進(jìn)度拖延。因此,對影響施工進(jìn)度的風(fēng)險因素進(jìn)行分析顯得尤為重要。傳統(tǒng)的進(jìn)度風(fēng)險分析方法并沒有全面分析風(fēng)險因素之間的相關(guān)性,導(dǎo)致項(xiàng)目施工進(jìn)度計劃的實(shí)施偏離目標(biāo)。決策與試驗(yàn)評價實(shí)驗(yàn)室(DEMATEL)方法運(yùn)用圖論與矩陣論原理對系統(tǒng)因素進(jìn)行分析,在社會學(xué)、經(jīng)濟(jì)學(xué)和生態(tài)學(xué)等領(lǐng)域有效地量化了風(fēng)險因素之間的相關(guān)性,因此,將DEMATEL方法引入到工程領(lǐng)域具有重要的探索價值。本文在研究施工進(jìn)度風(fēng)險分析領(lǐng)域現(xiàn)狀的基礎(chǔ)上,從風(fēng)險分析的源頭出發(fā),以風(fēng)險因素為研究對象,建立工程項(xiàng)目工序工期仿真模型,并使用JAVA語言進(jìn)行編程模擬。通過對風(fēng)險因素相關(guān)性理論的深入分析,引入DEMATEL方法并考慮了風(fēng)險因素的自相關(guān)性,在風(fēng)險因素綜合影響矩陣的基礎(chǔ)上增加單位矩陣進(jìn)行改進(jìn),利用隨機(jī)數(shù)發(fā)生器模擬風(fēng)險因素的發(fā)生概率,通過與預(yù)期相比得到風(fēng)險因素的狀態(tài),采用層次分析法量化風(fēng)險因素對工序工期的影響程度,從而模擬整個工程項(xiàng)目的總工期,并分析進(jìn)度計劃關(guān)鍵線路的分布概率和影響工程項(xiàng)目進(jìn)度的關(guān)鍵風(fēng)險因素,從而有效地控制施工進(jìn)度。為了研究風(fēng)險因素自相關(guān)性對工程項(xiàng)目進(jìn)度的影響,本文通過某廠房案例,應(yīng)用工序工期仿真模型,對進(jìn)度風(fēng)險因素進(jìn)行分析。案例分析結(jié)果表明,本文提出的工序工期仿真模型不僅得到工程項(xiàng)目的總工期分布,其計算結(jié)果與實(shí)際總工期比較接近,也可以得到進(jìn)度計劃關(guān)鍵線路分布概率和關(guān)鍵風(fēng)險因素,證實(shí)了基于風(fēng)險因素自相關(guān)性的分析方法的有效性。本文的研究結(jié)果為項(xiàng)目管理者提供了一個較好的預(yù)測工程項(xiàng)目總工期的計算模型,為不同風(fēng)險傾向的項(xiàng)目管理者估計項(xiàng)目完工時間提供了依據(jù),幫助項(xiàng)目管理者制定靈活的進(jìn)度管理方案和更具針對性的風(fēng)險應(yīng)對措施,從而確保進(jìn)度計劃的有效實(shí)施。
[Abstract]:Progress, as one of the three major objectives of project management, is an important part of project management. The openness and complexity of the construction environment make the implementation of the project often subject to outside uncertainties. Therefore, it is very important to analyze the risk factors that affect the progress of construction. Decision-making and test evaluation laboratory DEMATELL used graph theory and matrix theory to analyze system factors in sociology. The correlation between risk factors is effectively quantified in the fields of economics and ecology. Therefore, it is of great value to introduce the DEMATEL method into the field of engineering. Starting from the source of risk analysis, taking risk factors as the research object, the simulation model of project working procedure duration is established, and the programming simulation is carried out by using JAVA language. The DEMATEL method is introduced and the autocorrelation of risk factors is considered. The unit matrix is added on the basis of the comprehensive influence matrix of risk factors, and the probability of risk factors is simulated by random number generator. The state of risk factors is obtained by comparing with expected, and the influence of risk factors on process duration is quantified by analytic hierarchy process (AHP), so as to simulate the total construction period of the whole project. In order to study the influence of self-correlation of risk factors on project schedule, the distribution probability of key routes and the key risk factors affecting the progress of construction project are analyzed in order to control the construction schedule effectively. In this paper, the risk factors of schedule are analyzed by using the simulation model of working procedure duration in a workshop case. The result of case analysis shows that the simulation model of working procedure duration not only gets the distribution of total project duration, The calculated results are close to the actual total duration, and the distribution probability and the key risk factors of the key routes in the progress plan can also be obtained. The results of this paper provide a good calculation model for project managers to predict the total project duration. It provides a basis for the project managers with different risk propensity to estimate the project completion time, and helps the project managers to formulate flexible schedule management schemes and more targeted risk response measures to ensure the effective implementation of the schedule plan.
【學(xué)位授予單位】:南昌航空大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TU722

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 李亞群;段萬春;孫永河;杜元偉;;基于證據(jù)理論的群組DEMATEL改進(jìn)方法[J];計算機(jī)工程與應(yīng)用;2013年20期

2 崔強(qiáng);武春友;匡海波;;BP-DEMATEL在空港競爭力影響因素識別中的應(yīng)用[J];系統(tǒng)工程理論與實(shí)踐;2013年06期

3 李春榮;耿涌;薛冰;任婉俠;董會娟;;基于DEMATEL的城市可持續(xù)發(fā)展障礙因素分析——以沈陽市為例[J];應(yīng)用生態(tài)學(xué)報;2012年10期

4 陳勇強(qiáng);顧偉;;工程項(xiàng)目風(fēng)險管理研究綜述[J];科技進(jìn)步與對策;2012年18期

5 劉俊艷;;基于BN-CPM的工程進(jìn)度風(fēng)險因素相關(guān)性分析[J];水力發(fā)電學(xué)報;2011年06期

6 李軍輝;張?jiān)撇?祁神軍;王慶濤;;基于風(fēng)險相關(guān)性和隨機(jī)性的工序工期預(yù)測模型[J];武漢理工大學(xué)學(xué)報(信息與管理工程版);2010年06期

7 吳彪;許洪國;戴彤焱;;基于DEMATEL-ISM的高速公路作業(yè)區(qū)交通安全影響因素辨識[J];交通運(yùn)輸系統(tǒng)工程與信息;2010年05期

8 辛嶺;任愛勝;;基于DEMATEL方法的農(nóng)產(chǎn)品質(zhì)量安全影響因素分析[J];科技與經(jīng)濟(jì);2009年04期

9 趙道致;王元明;;基于PERT的項(xiàng)目工期風(fēng)險傳遞機(jī)制[J];工業(yè)工程;2008年04期

10 倪蔚穎;;蒙特卡洛模擬在項(xiàng)目成本風(fēng)險分析中的應(yīng)用[J];大眾科技;2008年07期

相關(guān)碩士學(xué)位論文 前6條

1 田鈺;工程項(xiàng)目進(jìn)度風(fēng)險分析與管理方法研究[D];天津大學(xué);2014年

2 巴延廷;基于PERT的工程進(jìn)度風(fēng)險分析研究[D];大連理工大學(xué);2010年

3 楊瑞麗;基于動態(tài)發(fā)展的建設(shè)項(xiàng)目風(fēng)險管理的研究[D];西安建筑科技大學(xué);2010年

4 李季;建設(shè)工程施工進(jìn)度控制研究[D];中國海洋大學(xué);2008年

5 張睿;工程項(xiàng)目的風(fēng)險分析技術(shù)與應(yīng)對方案評價研究[D];河海大學(xué);2005年

6 歐陽斌;工程網(wǎng)絡(luò)計劃進(jìn)度風(fēng)險分析及關(guān)鍵鏈進(jìn)度計劃法研究[D];天津大學(xué);2004年

,

本文編號:1676680

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/jianzhugongchenglunwen/1676680.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶c6b49***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com