天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 建筑工程論文 >

建筑工程應(yīng)急管理成熟度評(píng)價(jià)研究

發(fā)布時(shí)間:2018-02-03 07:55

  本文關(guān)鍵詞: 建筑工程 應(yīng)急管理 成熟度模型 評(píng)價(jià)指標(biāo)體系 出處:《新疆大學(xué)》2017年碩士論文 論文類型:學(xué)位論文


【摘要】:2015年《推動(dòng)共建絲綢之路經(jīng)濟(jì)帶和21世紀(jì)海上絲綢之路的愿景與行動(dòng)》的發(fā)布,標(biāo)志著“一帶一路”由初步構(gòu)想階段向?qū)嶋H行動(dòng)階段的過(guò)渡。“一帶一路”戰(zhàn)略的實(shí)施不僅給建筑業(yè)帶來(lái)良好的發(fā)展機(jī)遇,同時(shí)也提出了更高的要求。但是,建筑事故的頻頻發(fā)生,安全管理問(wèn)題已成為制約建筑行業(yè)健康發(fā)展的障礙,如何有效地進(jìn)行應(yīng)急管理以降低安全事故對(duì)建筑生產(chǎn)的負(fù)面影響,已成為如今工程項(xiàng)目管理領(lǐng)域亟需解決的難題。首先,本文對(duì)應(yīng)急管理相關(guān)理論與項(xiàng)目管理成熟度理論進(jìn)行了系統(tǒng)闡述,主要包括應(yīng)急管理、應(yīng)急管理能力以及應(yīng)急管理評(píng)價(jià)的定義和組成、項(xiàng)目管理成熟度理論的發(fā)展和特點(diǎn)以及運(yùn)用。其次,在梳理建筑工業(yè)特點(diǎn)、應(yīng)急安全防治工作以及現(xiàn)行法律的基礎(chǔ)上,對(duì)建設(shè)主管部門、施工企業(yè)、重大工程建設(shè)單位、燃?xì)馄髽I(yè)分別進(jìn)行問(wèn)卷調(diào)研,選取部分城市以實(shí)地調(diào)研與調(diào)查問(wèn)卷相結(jié)合的方式,對(duì)應(yīng)急管理體制、應(yīng)急預(yù)案體系、應(yīng)急資源保障、監(jiān)測(cè)預(yù)警、應(yīng)急處置五個(gè)方面的基本狀況與現(xiàn)存問(wèn)題進(jìn)行歸納與分析。然后,針對(duì)建筑工程應(yīng)急管理現(xiàn)存的問(wèn)題,從時(shí)間順序出發(fā),分別從事前預(yù)防、應(yīng)急準(zhǔn)備、應(yīng)急響應(yīng)、事后恢復(fù)四個(gè)方面對(duì)應(yīng)急管理能力進(jìn)行評(píng)價(jià)。運(yùn)用專家打分和專家訪談法對(duì)評(píng)價(jià)指標(biāo)進(jìn)行篩選,以項(xiàng)目管理成熟度模型為理論基礎(chǔ)來(lái)構(gòu)建建筑工程應(yīng)急管理成熟度模型。運(yùn)用改進(jìn)層次分析法、熵權(quán)法確定組合權(quán)重,灰色系統(tǒng)理論求得最終綜合評(píng)價(jià)值,確定成熟度等級(jí),從而構(gòu)造應(yīng)急管理改進(jìn)矩陣來(lái)分析項(xiàng)目的優(yōu)先改進(jìn)順序。最后,將建筑工程應(yīng)急管理成熟度模型對(duì)新疆某建筑工程項(xiàng)目進(jìn)行評(píng)估,對(duì)該項(xiàng)目應(yīng)急管理成熟度結(jié)果進(jìn)行分析與研究,并提出改進(jìn)建議。通過(guò)實(shí)例驗(yàn)證了該模型的可行性。
[Abstract]:The release of the Vision and Action to promote the Co-construction of the Silk Road Economic Belt and the Maritime Silk Road in 21th century on 2015. The implementation of Belt and Road strategy not only brings good development opportunities to the construction industry, but also puts forward higher requirements. With the frequent occurrence of construction accidents, safety management has become an obstacle to the healthy development of the construction industry. How to effectively carry out emergency management to reduce the negative impact of safety accidents on construction production. It has become an urgent problem in the field of engineering project management. First of all, the related theories of emergency management and maturity theory of project management have been systematically expounded, mainly including emergency management. The definition and composition of emergency management capability and emergency management evaluation, the development, characteristics and application of project management maturity theory. Secondly, combing the characteristics of construction industry. On the basis of emergency safety prevention and control work and existing laws, the construction departments, construction enterprises, major engineering construction units, gas enterprises were investigated with questionnaires. Selected some cities with the combination of field research and questionnaire, the emergency management system, emergency plan system, emergency resources protection, monitoring and early warning. The basic situation and existing problems in five aspects of emergency disposal are summarized and analyzed. Then, according to the existing problems of emergency management of construction engineering, starting from the time sequence, respectively from the pre-prevention, emergency preparedness. The ability of emergency management is evaluated in four aspects of emergency response and recovery. The evaluation index is screened by expert scoring and expert interview. Based on the project management maturity model, the paper constructs the construction engineering emergency management maturity model, uses the improved analytic hierarchy process (AHP), the entropy weight method to determine the combination weight, the grey system theory obtains the final comprehensive evaluation value. The maturity level is determined, and the emergency management improvement matrix is constructed to analyze the priority improvement order of the project. Finally, the construction engineering emergency management maturity model is used to evaluate a construction project in Xinjiang. This paper analyzes and studies the maturity results of the emergency management of the project and puts forward some suggestions for improvement. The feasibility of the model is verified by an example.
【學(xué)位授予單位】:新疆大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU71

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 周江平;;社會(huì)組織在社會(huì)主義市場(chǎng)經(jīng)濟(jì)中的作用研究[J];技術(shù)經(jīng)濟(jì)與管理研究;2017年03期

2 李佳慶;王雪青;夏妮妮;宋衛(wèi)乾;;“十三五”建筑業(yè)發(fā)展思考[J];城市;2016年09期

3 張海波;;中國(guó)總體國(guó)家安全觀下的安全治理與應(yīng)急管理[J];中國(guó)行政管理;2016年04期

4 張協(xié)奎;彭奕暉;楊觀帝;;我國(guó)建筑工程質(zhì)量保險(xiǎn)存在的問(wèn)題及對(duì)策研究[J];建筑經(jīng)濟(jì);2016年01期

5 唐勝穎;;建筑施工安全管理問(wèn)題及對(duì)策研究[J];安徽建筑;2015年05期

6 安曉萌;;中央大型建筑企業(yè)踐行“一帶一路”風(fēng)險(xiǎn)要點(diǎn)及應(yīng)對(duì)策略淺析[J];企業(yè)改革與管理;2015年13期

7 游志斌;薛瀾;;美國(guó)應(yīng)急管理體系重構(gòu)新趨向:全國(guó)準(zhǔn)備與核心能力[J];國(guó)家行政學(xué)院學(xué)報(bào);2015年03期

8 劉衛(wèi)東;;“一帶一路”戰(zhàn)略的科學(xué)內(nèi)涵與科學(xué)問(wèn)題[J];地理科學(xué)進(jìn)展;2015年05期

9 張永紅;趙爽;席歡;陳軍;;美政府問(wèn)責(zé)局關(guān)注GPS服務(wù)中斷的風(fēng)險(xiǎn)評(píng)估和應(yīng)對(duì)措施[J];衛(wèi)星應(yīng)用;2015年04期

10 張立國(guó);曲靜原;童節(jié)娟;劉濤;趙軍;;核電廠營(yíng)運(yùn)單位應(yīng)急響應(yīng)能力評(píng)估方法研究[J];科學(xué)技術(shù)與工程;2015年08期

相關(guān)重要報(bào)紙文章 前1條

1 陳麗丹;;美國(guó)國(guó)土安全部面臨關(guān)門窘境[N];人民日?qǐng)?bào);2015年

相關(guān)博士學(xué)位論文 前5條

1 Issayev Abilkhan;俄羅斯公務(wù)員制度研究[D];華東師范大學(xué);2015年

2 齊琪;煤礦應(yīng)急管理能力評(píng)價(jià)及提升研究[D];西安科技大學(xué);2014年

3 李磊;歐洲公司法律制度一體化研究[D];對(duì)外經(jīng)濟(jì)貿(mào)易大學(xué);2014年

4 郭金峰;俄羅斯亞太戰(zhàn)略研究[D];外交學(xué)院;2013年

5 王影;我國(guó)安全生產(chǎn)應(yīng)急管理標(biāo)準(zhǔn)化研究[D];哈爾濱工程大學(xué);2011年

相關(guān)碩士學(xué)位論文 前10條

1 趙秋瑩;綠色住宅開發(fā)項(xiàng)目風(fēng)險(xiǎn)識(shí)別與評(píng)價(jià)[D];吉林大學(xué);2016年

2 趙哲生;建筑施工企業(yè)應(yīng)急能力多級(jí)可拓評(píng)價(jià)研究[D];西安建筑科技大學(xué);2015年

3 李攀;中日兩國(guó)突發(fā)事件應(yīng)急處置比較研究[D];華東政法大學(xué);2015年

4 楊惠文;鐵路建設(shè)工程施工安全風(fēng)險(xiǎn)網(wǎng)格化管理及應(yīng)用研究[D];北京交通大學(xué);2015年

5 王饒;西安市社會(huì)組織參與應(yīng)急管理研究[D];長(zhǎng)安大學(xué);2014年

6 吳剛;低碳建筑體系成熟度模型研究[D];西南石油大學(xué);2014年

7 陳棉;市政工程項(xiàng)目管理成熟度評(píng)價(jià)研究[D];蘭州交通大學(xué);2014年

8 范文婧;日本防災(zāi)體制中政府與NPO協(xié)作機(jī)制研究[D];西南政法大學(xué);2014年

9 歐陽(yáng)佳;基于MBD的飛機(jī)裝配工裝功能模塊成熟度研究[D];南京航空航天大學(xué);2014年

10 馬威銘;風(fēng)險(xiǎn)管理在建設(shè)工程施工安全監(jiān)督管理中的應(yīng)用[D];華南理工大學(xué);2013年

,

本文編號(hào):1486842

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/jianzhugongchenglunwen/1486842.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶d3023***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com