海南昌江核電泵房進(jìn)水方案介紹及經(jīng)驗(yàn)總結(jié)
發(fā)布時(shí)間:2018-01-27 11:57
本文關(guān)鍵詞: 核電 PX泵房進(jìn)水 進(jìn)水方案 經(jīng)驗(yàn)總結(jié) 關(guān)鍵路徑 出處:《給水排水》2017年S2期 論文類型:期刊論文
【摘要】:海南昌江核電1#、2#機(jī)組是2臺(tái)二代壓水堆改進(jìn)型機(jī)組,其PX泵房進(jìn)水標(biāo)志著核島工藝系統(tǒng)調(diào)試全面正式鋪開,是海南核電按期發(fā)電的基礎(chǔ),因此制定合理可行的進(jìn)水方案十分重要。重點(diǎn)介紹了PX進(jìn)水方案,并對(duì)進(jìn)水過程中出現(xiàn)的問題進(jìn)行了分析總結(jié),希望對(duì)后續(xù)其他核電項(xiàng)目泵房進(jìn)水的施工提供一些參考經(jīng)驗(yàn)。
[Abstract]:Hainan Changjiang Nuclear Power Plant No. 1 #y2# unit is two second-generation pressurized water reactor improved units, its PX pump room water intake marks the full commissioning of the nuclear island process system, which is the basis of Hainan nuclear power generation on schedule. Therefore, it is very important to establish a reasonable and feasible influent scheme. The PX influent scheme is introduced emphatically, and the problems in the process of influent are analyzed and summarized. It is hoped to provide some reference experience for the construction of water intake in pump house of other nuclear power projects.
【作者單位】: 中國核電工程有限公司;
【分類號(hào)】:TU991
【正文快照】: 1 概述為了保證海南昌江項(xiàng)目1#機(jī)組泵房進(jìn)水計(jì)劃目標(biāo)的順利實(shí)現(xiàn),制定可行合理的PX泵房進(jìn)水方案尤為重要。進(jìn)水方案中必須明確泵房進(jìn)水路徑,確定實(shí)施步驟,全面考慮實(shí)施過程中可能出現(xiàn)的風(fēng)險(xiǎn),并制定相應(yīng)的防范措施,才能確保泵房進(jìn)水范圍內(nèi)所有施工工作順利進(jìn)行。本文將重點(diǎn)介紹
【相似文獻(xiàn)】
相關(guān)期刊論文 前2條
1 ;翻新在于細(xì)節(jié),自己動(dòng)手不馬虎[J];租售情報(bào).裝修情報(bào);2013年06期
2 黃東義;吳毓儀;熊詠梅;;廣東省綠道發(fā)展的經(jīng)驗(yàn)[J];園林;2013年04期
,本文編號(hào):1468418
本文鏈接:http://www.sikaile.net/jianzhugongchenglunwen/1468418.html
最近更新
教材專著