基于BIM的益通仲伯物流廠房工程項(xiàng)目進(jìn)度管理研究
本文關(guān)鍵詞:基于BIM的益通仲伯物流廠房工程項(xiàng)目進(jìn)度管理研究 出處:《中國海洋大學(xué)》2015年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: 進(jìn)度管理 BIM 項(xiàng)目管理
【摘要】:項(xiàng)目進(jìn)度管理是項(xiàng)目管理中的一項(xiàng)關(guān)鍵內(nèi)容,直接關(guān)系到項(xiàng)目的經(jīng)濟(jì)效益和社會效益,具有舉足輕重的地位。它不僅是通過一系列控制手段合理安排進(jìn)度,保證工程的按期完工,更是為項(xiàng)目的成本、物資、質(zhì)量、安全控制賦予了時間維度,按照項(xiàng)目的進(jìn)展和工序的搭接情況,進(jìn)行全面的項(xiàng)目控制。然而隨著建筑業(yè)的不斷發(fā)展,現(xiàn)有的進(jìn)度控制軟件和進(jìn)度管理方法已無法滿足日益復(fù)雜化、大型化且參與者眾多的建設(shè)項(xiàng)目的要求。BIM技術(shù)的出現(xiàn)和發(fā)展為建設(shè)項(xiàng)目進(jìn)度控制提供了新的方法。目前,BIM技術(shù)正逐漸應(yīng)用于項(xiàng)目的各個階段,但施工階段的研究還較不成熟,尤其是對于BIM在建設(shè)項(xiàng)目進(jìn)度控制中的應(yīng)用研究較少,且研究范圍較窄,理論性強(qiáng)但實(shí)際應(yīng)用較差。因此,極有必要對BIM技術(shù)應(yīng)用于建設(shè)項(xiàng)目進(jìn)度控制的方法進(jìn)行研究,構(gòu)建具有實(shí)際應(yīng)用價值的進(jìn)度控制系統(tǒng)。益通項(xiàng)目由于規(guī)模較大,管理較為復(fù)雜,同時由于業(yè)主要求較高,后期改動較大,運(yùn)用傳統(tǒng)的進(jìn)度管理方法已不能滿足現(xiàn)行管理要求,難度也非常大,為了能更加清晰合理并減少管理難度,項(xiàng)目管理中引入了現(xiàn)代信息技術(shù),將BIM技術(shù)應(yīng)用到本項(xiàng)目中,從而起到了關(guān)鍵性的作用,為項(xiàng)目順利進(jìn)行提供了保障。益通項(xiàng)目利用Revit軟件,構(gòu)建了建筑模型,并通過此軟件來指導(dǎo)項(xiàng)目進(jìn)度計(jì)劃的編制,在完成進(jìn)度計(jì)劃的基礎(chǔ)上,利用BIM技術(shù)進(jìn)行項(xiàng)目的進(jìn)度實(shí)時控制,及時的發(fā)現(xiàn)進(jìn)度偏差并采取措施糾正。實(shí)現(xiàn)了進(jìn)度的可視化、動態(tài)化、實(shí)時化、交互化的控制。在施工進(jìn)度控制中引入三維建筑信息模型進(jìn)行數(shù)據(jù)創(chuàng)建,進(jìn)而完成項(xiàng)目的4D建筑信息模型,在益通項(xiàng)目中選擇Revit軟件用于創(chuàng)建其三維建筑信息模型,進(jìn)行本項(xiàng)目的進(jìn)度管理實(shí)施平臺。引入BIM技術(shù)后,本項(xiàng)目的進(jìn)度管理過程獲得了極大的解放,也提高了其管理效率,比較了傳統(tǒng)的進(jìn)度管理模式。論文詳細(xì)闡述了BIM應(yīng)用于進(jìn)度計(jì)劃編制及進(jìn)度控制的內(nèi)容及效果,并相對明確的指出了基于BIM的進(jìn)度管理的應(yīng)用思路,益通項(xiàng)目的BIM進(jìn)度管理雖然取得了一定的成果,但也暴露出了一些問題,本文也對BIM的這些問題提出了看法,希望能為以后的應(yīng)用研究提供借鑒和發(fā)展建議。
[Abstract]:Project schedule management is a key content of project management, directly related to the economic and social benefits of the project, has a pivotal position, it is not only through a series of control means reasonable arrangement of progress. Ensure the completion of the project on schedule, but also for the project cost, material, quality, safety control given a time dimension, according to the progress of the project and the overlap of the process. Overall project control. However, with the development of the construction industry, the existing progress control software and schedule management methods can not meet the increasing complexity. The emergence and development of the BIM technology provides a new method for the progress control of the construction project. At present, the BIM technology is gradually applied in all stages of the project. But the research of construction stage is not mature, especially for the application of BIM in the construction project schedule control, and the scope of research is narrow, the theory is strong, but the practical application is poor. It is very necessary to study the method of applying BIM technology to construction project schedule control, and to build a progress control system with practical application value. Because of its large scale, Yitong project management is more complex. At the same time, due to the higher requirements of the owners, the late changes, the use of traditional schedule management methods can not meet the current management requirements, the difficulty is also very large, in order to be more clear and reasonable and reduce the difficulty of management. Modern information technology has been introduced into project management and BIM technology has been applied to this project, which has played a key role in ensuring the smooth progress of the project. Yitong project uses Revit software. The building model is constructed, and the software is used to guide the project schedule planning. On the basis of the completion of the progress plan, the real-time control of the project progress is carried out by using BIM technology. Timely detection of progress deviation and take measures to correct. Achieved progress visualization, dynamic, real-time, interactive control. In the construction schedule control, the introduction of three-dimensional building information model for data creation. Then complete the 4D building information model of the project, select Revit software to create its three-dimensional building information model in Yitong project, carry out the progress management implementation platform of this project. After introducing the BIM technology. The progress management process of the project has been greatly liberated, but also improved its management efficiency. Compared with the traditional schedule management mode. This paper describes the content and effect of BIM application in schedule planning and schedule control, and points out the application thinking of schedule management based on BIM. Although the progress management of BIM of Iitong project has made some achievements, but also exposed some problems, this paper also put forward some views on these problems of BIM. Hope to provide reference and development suggestions for future application research.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TU722
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 梁禮方;;項(xiàng)目進(jìn)度管理(下)[J];金融科技時代;2013年10期
2 劉耕,王學(xué)軍;國內(nèi)外項(xiàng)目進(jìn)度管理的比較及建議[J];重慶交通學(xué)院學(xué)報;2003年S1期
3 章勇武,尤建新,黃力 ,馬國豐;高速公路項(xiàng)目進(jìn)度管理信息系統(tǒng)設(shè)計(jì)研究[J];上海管理科學(xué);2005年05期
4 田豐春;;項(xiàng)目進(jìn)度管理研究[J];中國科技信息;2008年14期
5 聶淑萍;高建民;;項(xiàng)目進(jìn)度管理在國防科研項(xiàng)目管理中的應(yīng)用探析[J];國防技術(shù)基礎(chǔ);2008年07期
6 劉曉東;;基于知識管理的工程項(xiàng)目進(jìn)度管理持續(xù)改進(jìn)研究[J];建筑經(jīng)濟(jì);2009年05期
7 林進(jìn)峰;;工程項(xiàng)目進(jìn)度管理[J];廣東建材;2009年11期
8 楊紅霞;;項(xiàng)目進(jìn)度管理方法研究[J];山西建筑;2010年29期
9 杜建峰;江文杰;;項(xiàng)目進(jìn)度管理在公路施工建設(shè)中的意義及應(yīng)用[J];中國新技術(shù)新產(chǎn)品;2010年21期
10 楊振鵬;;工程項(xiàng)目進(jìn)度管理相關(guān)問題探討[J];東北水利水電;2011年12期
相關(guān)會議論文 前3條
1 楊正茂;;維生素C質(zhì)量升級項(xiàng)目進(jìn)度管理研究[A];第十屆沈陽科學(xué)學(xué)術(shù)年會論文集(農(nóng)業(yè)科學(xué)與醫(yī)藥科學(xué)分冊)[C];2013年
2 高華北;張花玲;周湘暉;黃曦;丁霞;王麗;鄢旭輝;嚴(yán)國興;;甘特圖在職業(yè)病危害評價項(xiàng)目進(jìn)度管理中的應(yīng)用[A];湖南省預(yù)防醫(yī)學(xué)會勞動衛(wèi)生專業(yè)委員會2008年學(xué)術(shù)交流會議論文集[C];2008年
3 孫慧;王麗華;;多層次模糊控制在工程項(xiàng)目進(jìn)度管理中的應(yīng)用[A];2005年中國機(jī)械工程學(xué)會年會論文集[C];2005年
相關(guān)重要報紙文章 前7條
1 彭潔;昆明辦審計(jì)項(xiàng)目進(jìn)度管理實(shí)現(xiàn)規(guī)范化[N];中國審計(jì)報;2013年
2 ;遼寧審計(jì)廳出臺審計(jì)項(xiàng)目進(jìn)度管理辦法[N];財(cái)會信報;2010年
3 曹忻;云南省審計(jì)廳實(shí)行項(xiàng)目進(jìn)度管理[N];中國審計(jì)報;2010年
4 項(xiàng)榮;深圳辦加強(qiáng)審計(jì)項(xiàng)目進(jìn)度管理[N];中國審計(jì)報;2012年
5 小城;遼寧出臺審計(jì)項(xiàng)目進(jìn)度管理辦法[N];中國稅務(wù)報;2010年
6 記者 李穎;增強(qiáng)藏區(qū)自我造血能力 助推藏區(qū)跨越發(fā)展[N];成都日報;2014年
7 通訊員 劉永良;雙永高速永定段完成投資15億元[N];閩西日報;2010年
相關(guān)博士學(xué)位論文 前2條
1 魏從剛;網(wǎng)絡(luò)化協(xié)同制造項(xiàng)目進(jìn)度管理技術(shù)研究[D];西北工業(yè)大學(xué);2006年
2 張敏;項(xiàng)目進(jìn)度管理的行為不確定性及其控制策略研究[D];華中科技大學(xué);2011年
相關(guān)碩士學(xué)位論文 前10條
1 秦國祥;HP公司軟件項(xiàng)目進(jìn)度管理研究[D];華東理工大學(xué);2015年
2 樊艷冬;DB總承包模式公路建設(shè)項(xiàng)目進(jìn)度管理研究[D];長安大學(xué);2015年
3 毛紅峰;法雷奧后霧燈開發(fā)項(xiàng)目進(jìn)度管理研究[D];蘭州大學(xué);2015年
4 李婷婷;A公司服務(wù)器新產(chǎn)品開發(fā)項(xiàng)目進(jìn)度管理研究[D];蘇州大學(xué);2015年
5 周鵬超;基于4D-BIM技術(shù)的工程項(xiàng)目進(jìn)度管理研究[D];江西理工大學(xué);2015年
6 溫洪彬;移動通信工程項(xiàng)目進(jìn)度管理的優(yōu)化研究[D];北京建筑大學(xué);2014年
7 衛(wèi)紅霞;雙河110kV智能變電站項(xiàng)目進(jìn)度管理研究[D];華北電力大學(xué);2015年
8 孫卓;110kV陽城變電站改造項(xiàng)目進(jìn)度管理研究[D];華北電力大學(xué);2015年
9 孫潤潤;基于BIM的城市軌道交通項(xiàng)目進(jìn)度管理研究[D];中國礦業(yè)大學(xué);2015年
10 張國勝;表面廢水處理工程項(xiàng)目進(jìn)度管理研究[D];中國科學(xué)院大學(xué)(工程管理與信息技術(shù)學(xué)院);2015年
,本文編號:1436240
本文鏈接:http://www.sikaile.net/guanlilunwen/wuliuguanlilunwen/1436240.html