天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

基于負(fù)荷響應(yīng)率的火電廠控制策略及經(jīng)濟(jì)運(yùn)行評(píng)價(jià)

發(fā)布時(shí)間:2019-05-20 09:51
【摘要】:電力市場(chǎng)的開展需要穩(wěn)定、可靠的運(yùn)營(yíng)環(huán)境。一個(gè)安全、優(yōu)質(zhì)、經(jīng)濟(jì)運(yùn)行的電力系統(tǒng)是進(jìn)行電力、電量交易的重要條件。隨著國(guó)內(nèi)各區(qū)域電網(wǎng)的峰谷差越來(lái)越大,電能質(zhì)量和電網(wǎng)安全運(yùn)行受到較大影響,,調(diào)度運(yùn)行困難越來(lái)越大。自動(dòng)發(fā)電控制是實(shí)現(xiàn)在線經(jīng)濟(jì)調(diào)度的必備條件,能優(yōu)化發(fā)電調(diào)度,降低發(fā)電費(fèi)用!皟蓚(gè)細(xì)則”是為了維護(hù)電力系統(tǒng)的安全穩(wěn)定運(yùn)行,保證電能質(zhì)量,是一種輔助管理措施。本文主要圍繞當(dāng)前主流的600MW機(jī)組,提出基于負(fù)荷響應(yīng)率的安全經(jīng)濟(jì)運(yùn)行策略。 首先對(duì)國(guó)內(nèi)外火電廠自動(dòng)發(fā)電控制和經(jīng)濟(jì)性評(píng)價(jià)的相關(guān)研究進(jìn)行了總結(jié)概述;其次,廣泛收集相關(guān)資料對(duì)火電廠運(yùn)行優(yōu)化策略與經(jīng)濟(jì)性相關(guān)理論進(jìn)行詳細(xì)解讀,根據(jù)河北南網(wǎng)某電廠機(jī)組基于負(fù)荷響應(yīng)率的運(yùn)行優(yōu)化工作實(shí)踐,研究分析了該類機(jī)組在河北南網(wǎng)實(shí)現(xiàn)運(yùn)行效益最大化的影響因素和工作成果;再次,根據(jù)相關(guān)理論資料結(jié)合河北南網(wǎng)某電廠的實(shí)際情況,提出建立火電廠基于負(fù)荷響應(yīng)率的運(yùn)行優(yōu)化及經(jīng)濟(jì)性綜合評(píng)價(jià),對(duì)該火電廠基于“兩個(gè)細(xì)則”市場(chǎng)環(huán)境運(yùn)營(yíng)情況進(jìn)行綜合分析評(píng)價(jià),以驗(yàn)證并探究影響河北南網(wǎng)該類機(jī)組火電廠運(yùn)行經(jīng)濟(jì)性的主要影響因素;最后從該電廠“兩個(gè)細(xì)則”的實(shí)施實(shí)證這些因素的影響程度,并提出從優(yōu)化機(jī)組負(fù)荷響應(yīng)率出發(fā)找到機(jī)組既安全又經(jīng)濟(jì)的平衡點(diǎn),從發(fā)電機(jī)組DCS系統(tǒng)性能、設(shè)備可靠性、企業(yè)管理等多方面對(duì)如何更好地提升發(fā)電機(jī)組負(fù)荷響應(yīng)率提出了策略,并說(shuō)明以設(shè)備可靠性管理為基礎(chǔ)的火電廠經(jīng)濟(jì)運(yùn)行重要的現(xiàn)實(shí)意義,來(lái)實(shí)現(xiàn)火電廠全壽命期內(nèi)綜合效益最大化與可持續(xù)發(fā)展。
[Abstract]:The development of power market needs a stable and reliable operating environment. A safe, high quality and economical power system is an important condition for power and electricity trading. With the increasing peak and valley difference of power grid in various regions of China, the power quality and safe operation of power grid are greatly affected, and the dispatching operation is becoming more and more difficult. Automatic power generation control is a necessary condition to realize online economic dispatching, which can optimize power generation scheduling and reduce power generation cost. The two rules are an auxiliary management measure to maintain the safe and stable operation of the power system and ensure the power quality. This paper mainly focuses on the current mainstream 600MW units, and puts forward a safe and economic operation strategy based on load response rate. Firstly, the related research on automatic power generation control and economic evaluation of thermal power plants at home and abroad is summarized and summarized. Secondly, the relevant data are widely collected to interpret the theory of operation optimization strategy and economy of thermal power plant in detail. According to the operation optimization practice of a power plant unit based on load response rate in Hebei South Power Network, The influencing factors and work results of maximizing the operation benefit of this kind of unit in Hebei South Power Network are studied and analyzed. Thirdly, according to the relevant theoretical data and the actual situation of a power plant in southern Hebei network, the operation optimization and economic comprehensive evaluation of thermal power plant based on load response rate are put forward. This paper makes a comprehensive analysis and evaluation of the operation of the thermal power plant based on the "two detailed rules" in order to verify and explore the main influencing factors on the operation economy of this kind of thermal power plant in Hebei Southern Power Network. Finally, the influence degree of these factors is proved by the implementation of the two detailed rules of the power plant, and the safe and economical balance point of the unit is found from optimizing the load response rate of the unit, from the performance of the DCS system of the generator set and the reliability of the equipment. The strategy of how to improve the load response rate of generator set is put forward in many aspects, such as enterprise management, and the important practical significance of economic operation of thermal power plant based on equipment reliability management is explained. To realize the maximization and sustainable development of comprehensive benefit in the whole life period of thermal power plant.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TM621;F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 葉成;許曉華;史永東;池虹;;火電廠主要設(shè)備節(jié)能降耗經(jīng)濟(jì)性分析[J];電力設(shè)備;2008年02期

2 盧連成;肖凌濤;溫柏堅(jiān);褚文捷;;媽灣電廠廠級(jí)自動(dòng)發(fā)電控制系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[J];電力系統(tǒng)自動(dòng)化;2011年17期

3 邢金峰;何占賓;楊興宇;習(xí)新魁;楊立波;;自動(dòng)發(fā)電控制在河北南部電網(wǎng)中的應(yīng)用[J];電力自動(dòng)化設(shè)備;2011年04期

4 張琦;楊斌;孫永再;;火電廠自動(dòng)發(fā)電控制系統(tǒng)的優(yōu)化設(shè)計(jì)[J];山西電力;2010年01期

5 蘇偉;;提高火電廠運(yùn)行經(jīng)濟(jì)性的探討[J];廣東科技;2009年22期

6 張玉勝;;火電廠AGC指標(biāo)提高與安全經(jīng)濟(jì)運(yùn)行探討[J];科技創(chuàng)新與應(yīng)用;2012年30期

7 李平康;火電廠AGC及其可視化仿真實(shí)現(xiàn)[J];華北電力技術(shù);2000年10期

8 李曉金 ,曹洪濤 ,張春發(fā);火電機(jī)組耗差分析系統(tǒng)的實(shí)現(xiàn)方式和數(shù)學(xué)模型的分析研究[J];華北電力技術(shù);2003年08期

9 周紅英;;AGC新模式下協(xié)調(diào)控制系統(tǒng)的分析及改進(jìn)[J];華北電力技術(shù);2010年04期

10 劉銘剛;自動(dòng)發(fā)電控制技術(shù)在電網(wǎng)中的應(yīng)用[J];華北電力大學(xué)學(xué)報(bào);2002年01期



本文編號(hào):2481565

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/shengchanguanlilunwen/2481565.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶eb25b***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com