標(biāo)桿電價(jià)下核電項(xiàng)目投資收益分析
發(fā)布時(shí)間:2018-11-12 18:48
【摘要】:介紹核電標(biāo)桿電價(jià)頒布的背景,然后分析核電工程造價(jià)、負(fù)荷因子、建設(shè)工期、核燃料價(jià)格等因素變化對(duì)標(biāo)桿電價(jià)下核電項(xiàng)目投資收益的影響,最后提出加強(qiáng)成本、進(jìn)度控制及加強(qiáng)電廠運(yùn)行管理,確保項(xiàng)目投資收益的建議。
[Abstract]:This paper introduces the background of the promulgation of the benchmark electricity price of nuclear power, and then analyzes the influence of the changes of nuclear power project cost, load factor, construction period, nuclear fuel price and other factors on the investment income of the nuclear power project under the benchmark electricity price, and finally puts forward the strengthening cost. Progress control and strengthen power plant operation management to ensure project investment returns suggestions.
【作者單位】: 深圳中廣核工程設(shè)計(jì)有限公司;中廣核工程有限公司;
【分類號(hào)】:F426.61;F426.23
本文編號(hào):2327911
[Abstract]:This paper introduces the background of the promulgation of the benchmark electricity price of nuclear power, and then analyzes the influence of the changes of nuclear power project cost, load factor, construction period, nuclear fuel price and other factors on the investment income of the nuclear power project under the benchmark electricity price, and finally puts forward the strengthening cost. Progress control and strengthen power plant operation management to ensure project investment returns suggestions.
【作者單位】: 深圳中廣核工程設(shè)計(jì)有限公司;中廣核工程有限公司;
【分類號(hào)】:F426.61;F426.23
【相似文獻(xiàn)】
相關(guān)期刊論文 前1條
1 徐福順;;強(qiáng)化投資經(jīng)營(yíng)管理勢(shì)在必行——關(guān)于中核集團(tuán)公司投資經(jīng)營(yíng)管理的思考[J];中國(guó)核工業(yè);1999年04期
相關(guān)重要報(bào)紙文章 前3條
1 楊崇偉;中核科技:能否抓住行業(yè)的機(jī)遇?[N];中國(guó)經(jīng)濟(jì)時(shí)報(bào);2007年
2 本報(bào)記者 劉偉勛 姜雷 康怡;多面康日新[N];經(jīng)濟(jì)觀察報(bào);2009年
3 姜雷 康怡 李寧;136家央企一把手中的中央委員[N];商務(wù)時(shí)報(bào);2009年
,本文編號(hào):2327911
本文鏈接:http://www.sikaile.net/guanlilunwen/shengchanguanlilunwen/2327911.html
最近更新
教材專著