配電網(wǎng)建設(shè)項目風(fēng)險管理研究

發(fā)布時間:2018-11-09 18:35
【摘要】:隨著電力行業(yè)的迅速發(fā)展,配電網(wǎng)建設(shè)的重要性也越來越凸顯。目前國家將資金投入到了配電網(wǎng)的建設(shè)中,我國電網(wǎng)的形式也開始從虧損轉(zhuǎn)向盈利。配電網(wǎng)的發(fā)展是社會發(fā)展、國家進(jìn)步的先行軍,配電網(wǎng)項目的建設(shè)效果直接關(guān)系著國民經(jīng)濟(jì)的加速前進(jìn)。而在配電網(wǎng)建設(shè)過程中,投入資金多、項目工程規(guī)模龐大、需要保障較高的可靠性、安全性等條件,導(dǎo)致項目建設(shè)中需要承擔(dān)的風(fēng)險較高。配電網(wǎng)建設(shè)項目的建設(shè)周期長,樣本資料存在誤差、不確定性強(qiáng)等特點(diǎn),因此使得規(guī)劃過程中的不確定因素很多。配電網(wǎng)建設(shè)項目是一項具有高度綜合性和技巧性的工作,同時也是一次具有較多投入與產(chǎn)出、高風(fēng)險的決策過程。因此需要對配電網(wǎng)建設(shè)項目的風(fēng)險影響因素進(jìn)行完善的評價后,并實(shí)施及時的防控,才能降低配電網(wǎng)建設(shè)項目的風(fēng)險。 本文通過對配電網(wǎng)建設(shè)項目風(fēng)險管理中關(guān)鍵問題的研究,提出了比較完善的配電網(wǎng)建設(shè)項目風(fēng)險管理的理論框架和方法體系。同時,配電網(wǎng)建設(shè)的風(fēng)險管理是一個動態(tài)的過程,在項目的不同時期,風(fēng)險決策的重要性也會不同,使得具體管理過程也不同。論文在建立了綜合評價理論框架及其指標(biāo)體系,綜合考慮政策、技術(shù)、經(jīng)濟(jì)和管理等相關(guān)因素,針對配電網(wǎng)建設(shè)項目的風(fēng)險情況建立基于模糊灰色評價法的風(fēng)險綜合評價模型,較好地解決了配電網(wǎng)建設(shè)項目評價中的指標(biāo)和權(quán)重的科學(xué)性問題。.并以某配電網(wǎng)建設(shè)項目為例,對其項目風(fēng)險進(jìn)行了結(jié)合定性與定量指標(biāo)的評價研究。通過評價結(jié)果可以看出,配電網(wǎng)經(jīng)營企業(yè)存在著一定的風(fēng)險,需要加以防控。針對配電網(wǎng)建設(shè)過程中種種風(fēng)險因素,本文根據(jù)風(fēng)險管理理論以及以往實(shí)踐經(jīng)驗(yàn),提出相應(yīng)的風(fēng)險防范策略,以消除風(fēng)險或減少風(fēng)險因素所帶來的危害。
[Abstract]:With the rapid development of power industry, the importance of distribution network construction is becoming more and more prominent. At present, the state has invested funds into the construction of distribution network, and the form of power grid in our country has also begun to shift from loss to profit. The development of distribution network is the development of society and the advance of national progress. The construction effect of distribution network project is directly related to the accelerated progress of national economy. In the process of distribution network construction, the project needs to ensure high reliability and safety, which leads to the high risk in the construction of the project. The construction period of distribution network construction project is long, the sample data exists error, and the uncertainty is strong, so there are many uncertain factors in the planning process. Distribution network construction project is a highly comprehensive and technical work, but also a decision-making process with more input and output, high risk. Therefore, it is necessary to evaluate the risk factors of distribution network construction project and implement timely prevention and control to reduce the risk of distribution network construction project. Based on the research of the key problems in the risk management of distribution network construction project, this paper puts forward a relatively perfect theoretical framework and method system of the distribution network construction project risk management. At the same time, distribution network construction risk management is a dynamic process, in different periods of the project, the importance of risk decision-making will be different, making the specific management process is also different. In this paper, the comprehensive evaluation theory framework and its index system are established, and the comprehensive risk evaluation model based on fuzzy grey evaluation method is established according to the risk situation of distribution network construction projects, considering the relevant factors such as policy, technology, economy and management. The scientific problem of index and weight in the evaluation of distribution network construction project has been solved well. Taking a distribution network construction project as an example, the project risk is evaluated by combining qualitative and quantitative indexes. It can be seen from the evaluation results that there are certain risks in distribution network management enterprises, which need to be prevented and controlled. According to the risk factors in the construction of distribution network, according to the risk management theory and previous practice experience, this paper puts forward the corresponding risk prevention strategy to eliminate the risk or reduce the risk factors.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 張鐵峰,苑津莎,郭偉;基于數(shù)據(jù)包絡(luò)分析的配電網(wǎng)投資項目經(jīng)濟(jì)評價[J];電力建設(shè);2005年07期

2 羅鳳章,肖峻,王成山,張永伍,郭鐵軍;計及電價波動的電網(wǎng)建設(shè)項目經(jīng)濟(jì)評估區(qū)間法[J];電網(wǎng)技術(shù);2005年08期

3 王晶;何永秀;戴愛英;王躍錦;何海英;;基于風(fēng)險與實(shí)物期權(quán)理論的城市電網(wǎng)規(guī)劃經(jīng)濟(jì)評價研究[J];華東電力;2010年02期

4 商迎秋;;企業(yè)戰(zhàn)略風(fēng)險識別模型構(gòu)建[J];技術(shù)經(jīng)濟(jì)與管理研究;2011年01期

5 張格亮;李昕;;風(fēng)險投資項目評估中幾種數(shù)學(xué)方法評析[J];牡丹江師范學(xué)院學(xué)報(自然科學(xué)版);2012年01期

6 劉寧;申曉留;;配電網(wǎng)改造風(fēng)險分析決策支持系統(tǒng)的研究和實(shí)現(xiàn)[J];現(xiàn)代計算機(jī)(專業(yè)版);2008年05期

7 馮斌;李大全;廖國威;;改進(jìn)的油氣管道風(fēng)險專家評分方法[J];油氣儲運(yùn);2008年11期

8 許滿庫;王海鯤;張東;;電網(wǎng)建設(shè)項目風(fēng)險評價研究[J];中國電力教育;2007年S2期

9 肖峻;何麗薇;羅鳳章;劉鳴;劉志巍;;基于區(qū)間的電力建設(shè)項目經(jīng)濟(jì)評估方法研究[J];中國電力;2006年12期

10 柴洪;馬竹書;;基于蒙特卡羅模擬法的工程項目財務(wù)風(fēng)險評估[J];項目管理技術(shù);2012年11期

相關(guān)碩士學(xué)位論文 前4條

1 陳明峗;配電GIS系統(tǒng)的設(shè)計與實(shí)現(xiàn)[D];華中科技大學(xué);2006年

2 王佳賢;城市配電網(wǎng)經(jīng)濟(jì)性評估研究[D];上海交通大學(xué);2008年

3 郅擎宇;城市配電網(wǎng)建設(shè)項目風(fēng)險管理研究[D];華北電力大學(xué)(河北);2008年

4 湯明陽;配電網(wǎng)建設(shè)改造的投資風(fēng)險識別與評價[D];華北電力大學(xué)(河北);2009年



本文編號:2321231

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/shengchanguanlilunwen/2321231.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a4796***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com