天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

工作研究在蛇形管制造作業(yè)優(yōu)化中的應用研究

發(fā)布時間:2018-10-25 19:16
【摘要】:我國電站設備制造企業(yè)得益于良好的國內(nèi)外宏觀形勢,行業(yè)出現(xiàn)了“井噴”行情,但是目前大多數(shù)電站設備制造企業(yè)還是傳統(tǒng)的國有企業(yè),公司的制造更多地還是采用勞動密集型的粗放制造方式,大多是靠一線職工通過“經(jīng)驗”積累進行生產(chǎn)制造。進入21世紀以來,隨著企業(yè)的不斷發(fā)展,客戶對產(chǎn)品的交貨期及產(chǎn)品質(zhì)量的要求越來越高,國內(nèi)電站設備制造企業(yè)希望通過科學的管理方法和有效的管理工具,優(yōu)化企業(yè)生產(chǎn)制造流程,促進企業(yè)的可持續(xù)健康發(fā)展。 本文立足于國內(nèi)電站設備龍頭企業(yè)SBWL公司生產(chǎn)制造實際,從蛇形管車間制造生產(chǎn)線現(xiàn)狀出發(fā),運用程序圖、線路圖的方法分析了蛇形管制造作業(yè)生產(chǎn)線存在的過多的不創(chuàng)造價值的搬運工序、在制品非常多及生產(chǎn)制造周期過長的問題,并運用工作研究的方法,對生產(chǎn)布局與制造工序進行了改善。運用操作研究、動作研究方法對蛇形管制造作業(yè)關鍵工序直管對接機械焊、彎管作業(yè)及裝配附件焊進行分析,運用人機圖、動素分析圖、作業(yè)單元重新劃分等方法,對生產(chǎn)線主要工序進行了改善,提高了人機利用率,規(guī)范了操作方法,,大大壓縮在制品庫存,用作業(yè)測定的方法,核定了標準工時,滿足企業(yè)制造能力提升的內(nèi)在需要和客戶新的評價標準的外部需要,提升企業(yè)的制造能力。
[Abstract]:China's power plant equipment manufacturing enterprises have benefited from the good macro situation at home and abroad, and the "blowout" market has emerged in the industry. However, at present, most power plant equipment manufacturing enterprises are still traditional state-owned enterprises. The company's manufacturing is more labor-intensive extensive manufacturing, mostly by the first-line staff through "experience" accumulation of production and manufacturing. Since entering the 21st century, with the continuous development of enterprises, customers are demanding more and more high product delivery time and product quality. Domestic power plant equipment manufacturers hope to adopt scientific management methods and effective management tools. Optimize the manufacturing process to promote the sustainable and healthy development of the enterprise. This paper is based on the production and manufacturing practice of SBWL Company, the leading enterprise of domestic power plant equipment, and based on the present situation of the production line of serpentine pipe workshop, the program diagram is used. The method of circuit diagram analyzes the problems of too many unproductive handling processes, very many in-process products and long production cycle in the production line of snake-shaped tube manufacturing, and applies the method of working research. The production layout and manufacturing process were improved. By means of operation research and action study, the mechanical butt welding of straight pipe, pipe bending operation and assembly accessory welding in the key process of serpentine tube manufacturing are analyzed, and the man-machine diagram, dynamic element analysis diagram and redivision of operation unit are used. The main working procedures of the production line are improved, the man-machine utilization ratio is improved, the operation method is standardized, the in-process inventory is greatly compressed, and the standard man-hour is approved by the method of job measurement. To meet the internal needs of enterprise manufacturing capability upgrading and external needs of new customer evaluation standards to enhance manufacturing capabilities.
【學位授予單位】:上海交通大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:TB497;F273;F426.4

【參考文獻】

相關期刊論文 前10條

1 孫建華,高廣章,蔣志強;生產(chǎn)線平衡的手段與方法研究[J];成組技術與生產(chǎn)現(xiàn)代化;2004年04期

2 韓偉;;火電設備制造業(yè)三十年:支撐更高效清潔的電力發(fā)展[J];電力設備;2008年08期

3 陳忠保;;上海電站設備制造業(yè)的可持續(xù)發(fā)展[J];電站輔機;2007年03期

4 劉廣;運用流程程序分析法優(yōu)化攤鋪機裝配流程[J];工程機械;2005年06期

5 齊二石;劉洪偉;;我國工業(yè)工程本土化研究與應用實踐分析[J];管理學報;2010年11期

6 高昆;汪浩;;1997~2009年中國電力設備市場運行研究[J];電器工業(yè);2010年10期

7 馬桂山;鄧偉;;發(fā)電設備產(chǎn)品結構調(diào)整和企業(yè)轉(zhuǎn)型升級的一些思考[J];電器工業(yè);2012年05期

8 趙濤,齊二石;工業(yè)工程發(fā)展歷程與趨勢淺析[J];機械設計;1997年09期

9 藺宇;齊二石;史英杰;;中國工業(yè)工程發(fā)展及其在制造業(yè)的應用研究[J];科學學與科學技術管理;2007年04期

10 李小兵;吉衛(wèi)喜;賈繼勇;;基于秒表法的工時定額測算過程研究與實現(xiàn)[J];計算機應用與軟件;2013年04期



本文編號:2294586

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/shengchanguanlilunwen/2294586.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶4d06a***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com