基于“三集五大”項目績效的哈爾濱電業(yè)局創(chuàng)新管理研究
發(fā)布時間:2018-05-21 11:17
本文選題:項目績效 + 哈爾濱電業(yè)局 ; 參考:《華北電力大學》2013年碩士論文
【摘要】:項目的績效管理就是對項目的績效計劃、控制、調(diào)整和溝通的過程,對企業(yè)經(jīng)營業(yè)績的管理有重要意義!笆濉笔菄译娋W(wǎng)公司深化“兩個轉(zhuǎn)變”、推進“三集五大”體系建設的關(guān)鍵時期,對于基層供電企業(yè),伴隨著電網(wǎng)和技術(shù)的飛速發(fā)展,“三集五大”帶來了績效管理模式的改變,如何設計和建立一套科學、實用、適應企業(yè)戰(zhàn)略發(fā)展需要的績效管理體系,已成為電力企業(yè)管理的一個非常重要課題。 本文通過對項目管理及績效管理理論的分析研究,重點探討在“三集五大”項目中運用績效管理方法和手段來提升該項目中員工的個人潛能,達到企業(yè)項目創(chuàng)新管理的目的。本文依據(jù)績效管理體系設計的基本原理,結(jié)合關(guān)鍵績效指標法(KPI)、目標管理法(MBO)等理論方法,以哈爾濱電業(yè)局“三集五大”項目為背景,在充分調(diào)查研究的基礎(chǔ)上,認真分析“三集五大”項目績效管理現(xiàn)狀以及在項目績效管理中存在的問題。充分運用個案分析和文獻研究相結(jié)合的方法,指出了該公司績效管理過程中存在的問題并提出了總體解決思路,依據(jù)績效管理體系設計的原則及科學的流程,最終設計出一套科學、合理的項目績效管理體系,為哈爾濱電業(yè)局“三集五大”項目績效管理,提高項目管理效率提供參考性建議。
[Abstract]:Project performance management is the process of project performance planning, control, adjustment and communication, which is of great significance to the management of enterprise performance. The 12th Five-Year Plan is a key period for the State Grid Company to deepen the "two transformations" and promote the construction of the "three sets and five major" system. For grass-roots power supply enterprises, with the rapid development of the power grid and technology, "three sets and five" has brought about the change of the performance management mode. How to design and establish a set of scientific, practical and suitable performance management system to meet the needs of the strategic development of enterprises has become a very important topic in the management of electric power enterprises. By analyzing the theory of project management and performance management, this paper focuses on the application of performance management methods and means in the "three sets and five" projects to enhance the individual potential of the employees in the project, and to achieve the purpose of enterprise project innovation management. According to the basic principle of the performance management system design, combining with the key performance index method (KPII), the objective management method (MBO) and other theoretical methods, this paper takes the "three sets and five" projects of Harbin Electric Power Bureau as the background, on the basis of full investigation and research. This paper analyzes the present situation of the project performance management and the problems in the project performance management. Using the method of case analysis and literature research, this paper points out the problems existing in the process of performance management of the company and puts forward the overall solution, according to the principles of performance management system design and scientific process. Finally, a set of scientific and reasonable project performance management system is designed, which provides reference suggestions for "three sets and five" project performance management and improving project management efficiency of Harbin Electric Power Bureau.
【學位授予單位】:華北電力大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:F426.61
【參考文獻】
相關(guān)期刊論文 前7條
1 傅新珠;王新建;袁慧宏;;實施卓越績效管理見成效[J];供電企業(yè)管理;2006年06期
2 郭立田,張旭蕾;建立企業(yè)集團內(nèi)部效績評價體系的再思考[J];河北經(jīng)貿(mào)大學學報;2005年01期
3 張西超;員工幫助計劃(EAP):提高企業(yè)績效的有效途徑[J];經(jīng)濟界;2003年03期
4 程承坪,詹志春;激勵與企業(yè)績效關(guān)系模型研究——兼論國有企業(yè)改革[J];科技與管理;2002年04期
5 焦玉振;;創(chuàng)新機制 規(guī)范供電所績效考核[J];農(nóng)村電工;2011年08期
6 吳金椿;關(guān)鍵績效指標與企業(yè)績效管理[J];企業(yè)經(jīng)濟;2000年12期
7 樂怡婷;;基于項目團隊生命周期的績效評估研究[J];商業(yè)時代;2007年03期
,本文編號:1918982
本文鏈接:http://www.sikaile.net/guanlilunwen/shengchanguanlilunwen/1918982.html
最近更新
教材專著