天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 管理論文 > 工程管理論文 >

基于任務可用度的設備維修建模與優(yōu)化研究

發(fā)布時間:2018-11-24 09:52
【摘要】:設備故障停機導致的總損失成本包括設備維修成本和生產(chǎn)任務損失成本。為減少多設備混聯(lián)生產(chǎn)系統(tǒng)中設備故障停機帶來的總損失成本,以設備停機總損失成本最小化為目標,綜合考慮設備失效率和修復率兩方面因素,建立了基于設備任務可用度的維修成本模型。探討了利用遺傳蟻群算法對模型進行優(yōu)化求解的方法。最后以發(fā)動機凸輪機加工線設備為例,驗證了所建模型的有效性。
[Abstract]:The total cost of equipment downtime includes equipment maintenance cost and production task loss cost. In order to reduce the total loss cost caused by equipment failure shutdown in multi-equipment hybrid production system, aiming at minimizing the total loss cost of equipment downtime, the failure rate and repair rate of equipment are considered comprehensively. The maintenance cost model based on the availability of equipment task is established. The optimization method of genetic ant colony algorithm is discussed. Finally, the validity of the model is verified by taking the engine cam machining line equipment as an example.
【作者單位】: 合肥工業(yè)大學機械工程學院;
【分類號】:TK406;TP18

【相似文獻】

相關期刊論文 前1條

1 李小波;王宏偉;李良鋒;;基于可用度的發(fā)動機旋轉(zhuǎn)部件維修時機決策[J];裝備制造技術;2011年12期



本文編號:2353219

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/gongchengguanli/2353219.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶1fdd3***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com