多應(yīng)力、多失效模式的集中器可靠性評(píng)估方法
[Abstract]:In order to ensure the concentrator running smoothly in complex environment such as temperature, humidity, electric stress, vibration and so on, it is necessary to solve the problem of reliability evaluation of integrated sudden change fault and performance degradation. Therefore, in view of the temperature and humidity double stress accelerated test of concentrator, starting with two failure modes, such as sudden failure of communication failure and degradation failure of error of analog quantity, the AIC/BIC information criterion is used synthetically. Degenerate quantity distribution model and Peck acceleration model are used to evaluate the reliability of different failure modes. Finally, based on the competitive failure model, The reliability evaluation method of concentrator in complex environment of temperature and humidity is presented.
【作者單位】: 中國(guó)電力科學(xué)研究院;北京航空航天大學(xué)可靠性與系統(tǒng)工程學(xué)院;
【基金】:國(guó)家電網(wǎng)公司科技項(xiàng)目:計(jì)量裝置運(yùn)行狀態(tài)評(píng)估與壽命診斷分析技術(shù)研究 國(guó)家工信部技術(shù)基礎(chǔ)課題(JSZL2014601B004)
【分類號(hào)】:TB114.3;TM933.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 和曉軍;劉磊;;網(wǎng)絡(luò)電能表集中器的設(shè)計(jì)與實(shí)現(xiàn)[J];計(jì)算機(jī)與現(xiàn)代化;2009年07期
2 張永華;田強(qiáng);;低溫環(huán)境下集中器安裝方式的改良[J];農(nóng)村電氣化;2011年12期
3 盧建生;李建華;;在集中器進(jìn)線前加裝接線盒的必要性[J];農(nóng)村電工;2013年03期
4 封陽玲;;規(guī)范智能表管理 分析集中器的故障原因[J];低碳世界;2013年18期
5 高勝利;李貽軍;馮文秀;;鏈表方式集中器抄表的設(shè)計(jì)[J];電測(cè)與儀表;2014年01期
6 倪陳強(qiáng);曾祥嶺;;嵌入式低壓載波集中器的設(shè)計(jì)[J];電工技術(shù);2008年09期
7 范羽;;低壓集中器系統(tǒng)的研究與設(shè)計(jì)[J];裝備制造技術(shù);2010年08期
8 岳虎;郭萬祝;劉茁;;電力用戶用電信息采集系統(tǒng)中集中器的調(diào)試[J];工業(yè)計(jì)量;2011年S2期
9 趙金龍;;集中器遠(yuǎn)程物聯(lián)升級(jí)[J];信息系統(tǒng)工程;2012年03期
10 巫鐘興;鄭安剛;鄒和平;陳昊;喬文俞;;集中器本地通信模塊接口協(xié)議檢測(cè)系統(tǒng)的設(shè)計(jì)[J];低壓電器;2012年18期
相關(guān)會(huì)議論文 前6條
1 林建a,
本文編號(hào):2169874
本文鏈接:http://www.sikaile.net/guanlilunwen/gongchengguanli/2169874.html