天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 管理論文 > 成本管理論文 >

黃埔海關(guān)跨境通關(guān)系統(tǒng)項(xiàng)目成本與進(jìn)度控制診斷分析

發(fā)布時(shí)間:2018-03-15 09:39

  本文選題:海關(guān) 切入點(diǎn):進(jìn)度管理 出處:《華南理工大學(xué)》2014年碩士論文 論文類型:學(xué)位論文


【摘要】:項(xiàng)目管理是一門現(xiàn)代化的管理技術(shù),是工程技術(shù)、管理理論和項(xiàng)目實(shí)踐結(jié)合的產(chǎn)物,在許多工業(yè)國(guó)家里己得到了廣泛應(yīng)用。項(xiàng)目管理的理論來自于管理項(xiàng)目的工作總結(jié),項(xiàng)目進(jìn)度管理、成本管理等同為項(xiàng)目管理的重要組成部分,是一種特別適用于那些責(zé)任重、關(guān)系多、時(shí)間緊、資源少的一次性任務(wù)的管理方法。 海關(guān)作為政府部門,隨著社會(huì)發(fā)展的需要,進(jìn)出口業(yè)務(wù)的不斷增加,,許多方面都存在業(yè)務(wù)改革、法規(guī)調(diào)整、開發(fā)軟件等項(xiàng)目計(jì)劃,但是由于政府機(jī)構(gòu)一系列體制制約、管理人才的缺失、管理項(xiàng)目的國(guó)有性和人員流動(dòng)大、項(xiàng)目周期長(zhǎng)、負(fù)責(zé)人變化多的實(shí)際情況,從未有過系統(tǒng)的管理方法,導(dǎo)致項(xiàng)目的成本超標(biāo)、進(jìn)度延緩,極大影響了對(duì)外的通關(guān)效率,因此對(duì)合適成熟的項(xiàng)目管理經(jīng)驗(yàn)與措施有著較強(qiáng)的需要。 本文以黃埔海關(guān)跨境通關(guān)系統(tǒng)項(xiàng)目前段工作實(shí)際情況為依據(jù),針對(duì)當(dāng)前跨境通關(guān)系統(tǒng)項(xiàng)目在成本管理、進(jìn)度管理中存在的問題,探索出一些便于項(xiàng)目管理的方法,給工程項(xiàng)目的下一階段提出具體的措施,以及為進(jìn)一步完善跨境通關(guān)系統(tǒng)項(xiàng)目管理體系提供可靠依據(jù),也為海關(guān)及部分政府部門制定相對(duì)應(yīng)的管理措施提供合適的管理方法。本文首先論述了項(xiàng)目管理相關(guān)的理論,介紹了項(xiàng)目管理的基本方法內(nèi)容。再通過跨境通關(guān)系統(tǒng)項(xiàng)目為研究對(duì)象,對(duì)該項(xiàng)目的成本管理、進(jìn)度管理兩個(gè)方面進(jìn)行細(xì)致的問題診斷分析,結(jié)合工作分解結(jié)構(gòu)、甘特圖和掙值管理方法對(duì)項(xiàng)目進(jìn)行研究,結(jié)合對(duì)已完成的工作的預(yù)算費(fèi)用、已完成工作的實(shí)際費(fèi)用和計(jì)劃工作的預(yù)算費(fèi)用三個(gè)方面,繪畫出成本進(jìn)度變化的圖形,形成項(xiàng)目的動(dòng)態(tài)管理;通過管理發(fā)現(xiàn)問題并制定出若干項(xiàng)目控制的措施,并采取相關(guān)辦法進(jìn)行項(xiàng)目成本與進(jìn)度的控制,最后通過分析實(shí)施措施以后取得的成效論證方法的可行性和有效性。通過該項(xiàng)目的研究,很好地指導(dǎo)項(xiàng)目的實(shí)施,保證成本與進(jìn)度按計(jì)劃實(shí)施,也為日后海關(guān)的各項(xiàng)工作規(guī)劃作出相應(yīng)的措施。
[Abstract]:Project management is a modern management technology, which is the result of the combination of engineering technology, management theory and project practice, and has been widely used in many industrial countries. The theory of project management comes from the summary of project management work. Project schedule management and cost management are both important components of project management. They are especially suitable for one-off tasks with heavy responsibilities, more relationships, tight time and less resources. As a government department, with the need of social development and the increasing import and export business, there are business reform, regulation adjustment, software development and other project plans in many aspects. However, due to a series of institutional constraints of government agencies, The lack of managerial talent, the large state-owned nature and staff flow of the management project, the long project cycle, the many changes in the responsible person, and the fact that there has never been a systematic management method has led to the cost of the project exceeding the standard and the progress of the project being delayed. It greatly affects the efficiency of foreign customs clearance, so there is a strong need for appropriate and mature project management experience and measures. Based on the actual situation of the previous section of the Whampoa Customs Cross-Border Customs system Project, this paper, aiming at the problems existing in the cost management and schedule management of the current cross-border customs clearance system project, explores some methods that are convenient for the project management. To put forward specific measures for the next stage of the project, and to provide reliable basis for further improving the project management system of cross-border customs clearance system. It also provides appropriate management methods for customs and some government departments to formulate corresponding management measures. Firstly, this paper discusses the relevant theories of project management. This paper introduces the basic methods of project management. Then, through the project of cross-border customs clearance system as the research object, the cost management and schedule management of the project are analyzed in detail, and the work breakdown structure is combined. Gantt chart and earned value management method are used to study the project, drawing out the change of cost progress in three aspects: the budget cost of the completed work, the actual cost of the completed work and the budget cost of the planned work. Form the dynamic management of the project, through the management to discover the problem and draw up some measures of project control, and adopt the related method to control the project cost and progress, Finally, through the analysis of the feasibility and effectiveness of the effectiveness demonstration method after the implementation measures, through the research of the project, the implementation of the project is well guided to ensure that the cost and schedule are carried out according to the plan. Also for the future customs work plan to make corresponding measures.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F752.5

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 崔德法 ,張艷玲;跑項(xiàng)目之風(fēng)何時(shí)休[J];中州審計(jì);2004年07期

2 宣洪福;;工程項(xiàng)目預(yù)算評(píng)審中的問題及研究對(duì)策[J];財(cái)經(jīng)界(學(xué)術(shù)版);2008年01期

3 郭世紅;韓文偉;;政采維護(hù)項(xiàng)目的管理研究[J];中國(guó)新技術(shù)新產(chǎn)品;2010年06期

4 郭寶霞;;試論建筑項(xiàng)目施工成本要點(diǎn)及核算方式優(yōu)化[J];齊魯珠壇;2011年03期

5 肖小蘇;;關(guān)于加快項(xiàng)目預(yù)算執(zhí)行進(jìn)度的研究[J];會(huì)計(jì)之友;2012年12期

6 辜榕容;樊成蘭;趙竹明;;加快項(xiàng)目預(yù)算執(zhí)行的對(duì)策研究[J];會(huì)計(jì)師;2013年17期

7 梁戈夫;張彥鳳;王娟;;論投資項(xiàng)目預(yù)算效益審計(jì)的三種價(jià)值層次[J];消費(fèi)導(dǎo)刊;2007年07期

8 張麗平;;淺談煤氣管網(wǎng)鋪設(shè)項(xiàng)目預(yù)算與結(jié)算控制[J];中華民居(下旬刊);2013年11期

9 蘇昂;;淺談地勘單位的地質(zhì)項(xiàng)目預(yù)算[J];中國(guó)總會(huì)計(jì)師;2014年02期

10 柯德明;蹇志惠;;項(xiàng)目前期的財(cái)務(wù)控制[J];財(cái)政監(jiān)察;2001年05期

相關(guān)會(huì)議論文 前1條

1 張愛勤;陶小斌;;如何做好建筑項(xiàng)目的成本分析[A];土木建筑學(xué)術(shù)文庫(kù)(第9卷)[C];2008年

相關(guān)重要報(bào)紙文章 前10條

1 本報(bào)記者 康磊;市財(cái)政局為重大項(xiàng)目建設(shè)當(dāng)好“掌柜”[N];長(zhǎng)春日?qǐng)?bào);2007年

2 通山縣扶貧辦主任 阮班雨;落實(shí)科學(xué)發(fā)展觀 加強(qiáng)后扶項(xiàng)目資金使用和管理[N];咸寧日?qǐng)?bào);2009年

3 ;《關(guān)于促進(jìn)項(xiàng)目審批工作提速增效的意見(試行)》[N];廈門日?qǐng)?bào);2010年

4 記者 解希民 唐夕建 通訊員 田進(jìn)國(guó);寧夏用項(xiàng)目管好政府“錢袋子”[N];中國(guó)財(cái)經(jīng)報(bào);2012年

5 本報(bào)記者 劉愛平;深圳代建制牛刀小試[N];中國(guó)交通報(bào);2004年

6 方興業(yè);2005年度績(jī)效審計(jì)顯示問題仍不少[N];深圳特區(qū)報(bào);2005年

7 中國(guó)駐泰國(guó)使館經(jīng)商處 劉國(guó)玉;我國(guó)企業(yè)須謹(jǐn)慎承攬?zhí)┤蕫畚蓓?xiàng)目[N];國(guó)際商報(bào);2006年

8 記者 沙瑪建峰 通訊員 楊明;中央地勘基金中南項(xiàng)目部成立[N];中國(guó)國(guó)土資源報(bào);2008年

9 趙建皿;我市加強(qiáng)項(xiàng)目投資評(píng)審 束緊政府“錢袋子”[N];巴中日?qǐng)?bào);2009年

10 韓青 特約記者 陶世銀;項(xiàng)目資金系上“安全帶”[N];自貢日?qǐng)?bào);2009年

相關(guān)博士學(xué)位論文 前1條

1 崔晶晶;工程項(xiàng)目腐敗致因模型與廉潔管理體系的開發(fā)應(yīng)用[D];清華大學(xué);2013年

相關(guān)碩士學(xué)位論文 前10條

1 王旭光;東營(yíng)水城雪蓮大劇院項(xiàng)目預(yù)算評(píng)審風(fēng)險(xiǎn)研究[D];山東大學(xué);2012年

2 徐德峰;太原世界貿(mào)易中心項(xiàng)目成本控制研究[D];天津大學(xué);2011年

3 姚偉;A工程公司項(xiàng)目成本控制技術(shù)研究[D];上海交通大學(xué);2012年

4 何晉冬;GFK公司杰迪項(xiàng)目的成本優(yōu)化[D];華南理工大學(xué);2015年

5 何源;中石油丙烯腈項(xiàng)目成本控制研究[D];華東理工大學(xué);2013年

6 廖俊杰;黃埔海關(guān)跨境通關(guān)系統(tǒng)項(xiàng)目成本與進(jìn)度控制診斷分析[D];華南理工大學(xué);2014年

7 錢x

本文編號(hào):1615467


資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/chengbenguanlilunwen/1615467.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶4f9da***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com