寧夏電力公司工程的全過程財務管理研究
本文選題:電力工程 切入點:財務管理 出處:《寧夏大學》2017年碩士論文 論文類型:學位論文
【摘要】:近些年,寧夏電力公司電網工程投資在資金籌集和投資控制方面存在極大的問題,主要由不斷地高位運行、投資規(guī)模大、建設周期長等造成。電力行業(yè)較早實現(xiàn)了工程財務與生產財務并軌,但是電力行業(yè)工程財務管管理仍以會計核算和資金管理作為重點對象,很多情況下相當于只完成了會計和出納的職能,在面臨重大的電網工程管理問題時,工程的全過程管理水平就凸顯出許多問題。本文綜合闡述了國外和國內關于重大工程方面的財務管理和電網基建工程全過程管理的理論研究以及對應的研究成果,通過實際與理論相結合的方法,以寧夏電力公司的向陽220kV輸變電工程作為切入點,對工程全過程財務管理中八個階段,規(guī)劃可研、初步設計、招投標、實施、竣工驗收、竣工結算、竣工決算、財務后評價等一一剖析,對其研究,從而找到該公司在工程財務管理方面存在的不足。通過分析和綜合評價,查找問題、尋求解決問題的辦法,提出詳細的工作計劃以及具體工作方式,使財務逐步參與到工程財務管理的各個階段。最后通過本文的研究建議,提升工程全過程財務管理的可操作性,使財務人員參與工程全過程管理各階段的工作落到實處,承擔應有的責任和義務。使得工程全過程財務管理工作職責界面越來越清晰,工程項目建設有序穩(wěn)健開展,以提升寧夏電力公司工程全過程的財務管理水平。
[Abstract]:In recent years, Ningxia Electric Power Company's power grid project investment has great problems in raising funds and controlling investment, mainly by constantly running at a high level, and the scale of investment is large. The electric power industry realized the integration of engineering finance and production finance earlier, but the engineering financial management of electric power industry still focused on accounting and fund management. In many cases, it is equivalent to only performing accounting and cashier functions, and in the face of major grid project management problems, The whole process management level of the project highlights many problems. This paper comprehensively expounds the theoretical research and corresponding research results on the financial management of major engineering and the whole process management of power network capital construction project both at home and abroad. Through the combination of practice and theory, taking the Xiangyang 220 kV transmission and transformation project of Ningxia Electric Power Company as the breakthrough point, eight stages of financial management in the whole process of the project, including planning and research, preliminary design, bidding, implementation, completion and acceptance, are made. In order to find out the shortcomings of the company in the project financial management, through the analysis and comprehensive evaluation, we can find out the problem and find out the solution to the problem. Put forward the detailed work plan and the concrete work way, make the finance participate in every stage of the project financial management step by step. Finally, through the research suggestion of this article, improve the maneuverability of the financial management of the whole process of the project, In order to make the financial personnel participate in the work of the whole process management of the project, take the responsibility and obligation, make the interface of the responsibility of the financial management of the whole process of the project more and more clear, the construction of the project is carried out orderly and steadily. In order to improve the Ningxia Electric Power Company in the whole process of financial management.
【學位授予單位】:寧夏大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:F406.72;F426.61
【參考文獻】
相關期刊論文 前10條
1 李天鵬;;電力施工企業(yè)工程項目財務全過程管控措施探討[J];新經濟;2016年35期
2 張東;潘明喜;;淺談大數據時代下電力基建項目的全過程財務管理[J];財政監(jiān)督;2016年23期
3 李炎橋;叢穎;;淺談電力基建項目全過程財務管理[J];財會學習;2016年19期
4 段青;;新時期電力工程財務管理分析[J];時代金融;2016年26期
5 王卓;;創(chuàng)新管理提升工程全過程財務管理水平[J];商;2016年29期
6 李風芹;;電力企業(yè)工程財務管理的問題探究[J];財經界(學術版);2016年11期
7 賈樂樂;;探析電力工程施工成本控制與工程財務管理[J];經貿實踐;2016年02期
8 王軍;郝敏;;電網企業(yè)工程全過程財務管理存在的問題及對策分析[J];安徽電氣工程職業(yè)技術學院學報;2015年04期
9 竇茂勝;;電力工程財務管理中存在的問題及解決對策[J];中國市場;2015年42期
10 武淑范;;對電力工程全過程財務管理的研究[J];東方企業(yè)文化;2015年19期
相關碩士學位論文 前7條
1 譚薇;農田水利工程項目財務管理研究[D];中南林業(yè)科技大學;2015年
2 楊艷;鐵路運輸企業(yè)更新改造項目財務管理研究[D];石家莊鐵道大學;2014年
3 崔克檐;項目管理在科研院所科研經費全過程管理中的應用研究[D];大連海事大學;2014年
4 霍成忠;某電網公司工程財務管理系統(tǒng)的設計與實現(xiàn)[D];廈門大學;2014年
5 楊慧;中國移動通信集團寧夏有限公司工程財務管理KPI指標結果提升的策略研究[D];寧夏大學;2013年
6 趙勇;甘肅省電力公司基建項目全過程財務管理體系構建研究[D];蘭州大學;2011年
7 張義昆;地區(qū)電力公司工程項目財務管理系統(tǒng)需求與設計[D];華北電力大學(北京);2008年
,本文編號:1619746
本文鏈接:http://www.sikaile.net/guanlilunwen/caiwuguanlilunwen/1619746.html