國電泉州熱電有限公司監(jiān)控信息系統(tǒng)項(xiàng)目后評價(jià)研究
[Abstract]:The rapid development of Internet technology and communication technology has promoted the progress and transformation of power generation enterprises in information technology and control technology. However, decentralized control systems, fieldbus systems and various office systems, production management decision-making systems can not achieve data interconnection, forming an information island. Plant-level monitoring information system (hereinafter referred to as SIS) to solve this problem. Through the post-evaluation study of completed projects, other thermal power plants can make reference to implement SIS projects, ensure the project quality and improve the success rate of the projects. Compared with the post-evaluation work in other industries, the post-evaluation of the information project of power generation enterprises is still in its infancy. The information project research of power supply enterprises can be used as a reference. On this basis, it is urgent to construct a research model of post-evaluation of the implementation effect of information projects suitable for power generation enterprises. This paper expounds the background and significance of the topic, discusses the present situation of post-evaluation research at home and abroad, and introduces the related concepts and methods of post-evaluation theory. Then it introduces the SIS system project of Guodian Quanzhou Thermal Power Co., Ltd., compares the Project Post-Evaluation Guide of China Guodian Group Company with the Central Enterprise fixed assets Investment Project Post Evaluation work Guide, and takes this as the basis. According to the actual situation of the project and the opinions of the users and experts, the relevant evaluation indexes are adjusted and the evaluation index system of the project is constructed. In this paper, the post-evaluation index system based on AHP is adopted to determine the corresponding index weight, and the final score of the project is calculated by the method of project success degree. Its rating of A indicates that the project is successful. The research in this paper shows that by constructing a reasonable index system and carrying out reasonable and effective post-evaluation and analysis on the power plant level monitoring information system project, it can provide more comprehensive support for the decision-making of the power generation enterprise managers. It also shows that the information system construction project can improve the quality and efficiency of power generation enterprises. Through the analysis and research of this paper, it is hoped that it can provide some reference experience for the construction, application and evaluation of plant level monitoring information system project in power generation enterprises.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 萬靖;賴敏;張威;;電網(wǎng)建設(shè)項(xiàng)目經(jīng)濟(jì)效益后評價(jià)方法研究[J];湖北電力;2016年01期
2 楊惠賢;唐向東;;試論企業(yè)投資項(xiàng)目后評價(jià)的意義[J];中國商論;2015年32期
3 王軍;郝敏;;電網(wǎng)企業(yè)工程全過程財(cái)務(wù)管理存在的問題及對策分析[J];安徽電氣工程職業(yè)技術(shù)學(xué)院學(xué)報(bào);2015年04期
4 喬越;;中小型水電工程項(xiàng)目后評價(jià)體系的建設(shè)[J];四川水力發(fā)電;2015年06期
5 朱紅衛(wèi);;輸變電項(xiàng)目后評價(jià)指標(biāo)體系構(gòu)建[J];科技資訊;2015年27期
6 張方銀;;電網(wǎng)建設(shè)項(xiàng)目后評價(jià)指標(biāo)計(jì)算與分析[J];貴州電力技術(shù);2015年08期
7 楊如明;賈巍;馬千里;;電網(wǎng)項(xiàng)目后評價(jià)體系研究及應(yīng)用[J];浙江電力;2015年04期
8 華澤嘉;侯晨璇;谷彥章;;基于AHP和D-S證據(jù)理論的風(fēng)電項(xiàng)目綜合后評價(jià)研究[J];可再生能源;2015年02期
9 姚莉;陳水銀;羅凌睿;于磊;羅莉;;建立投資項(xiàng)目后評價(jià)管理體系構(gòu)想[J];天然氣技術(shù)與經(jīng)濟(jì);2014年06期
10 李曉慧;胡俊輝;谷楊福;;特高壓工程項(xiàng)目財(cái)務(wù)管理三維風(fēng)險(xiǎn)控制體系研究[J];現(xiàn)代經(jīng)濟(jì)信息;2014年21期
相關(guān)碩士學(xué)位論文 前1條
1 魏曉穎;基于模糊層次分析法的電力公司財(cái)務(wù)風(fēng)險(xiǎn)評價(jià)[D];華北電力大學(xué);2012年
,本文編號:2273951
本文鏈接:http://www.sikaile.net/gongshangguanlilunwen/2273951.html