天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 管理論文 > 工商管理論文 >

千島湖游艇建造工程項(xiàng)目進(jìn)度成本管理研究

發(fā)布時(shí)間:2018-01-22 14:07

  本文關(guān)鍵詞: 項(xiàng)目管理 進(jìn)度成本管理 掙值法 CPM WBS 出處:《西南交通大學(xué)》2017年碩士論文 論文類型:學(xué)位論文


【摘要】:中國緊隨美國、歐洲等消費(fèi)大國成為游艇制造的第三國家,也是游艇消費(fèi)的第一潛在大市場(chǎng)。在建造行業(yè)的激烈競爭下,游艇建造單位須不斷提高自身技術(shù)和管理水平。在項(xiàng)目實(shí)施前,做前期進(jìn)度成本計(jì)劃,在項(xiàng)目實(shí)施過程中及時(shí)面對(duì)現(xiàn)實(shí)情況提出優(yōu)化措施,在優(yōu)化時(shí),充分考慮項(xiàng)目自身的特性,增強(qiáng)優(yōu)化方法的針對(duì)性、實(shí)用性,因此,針對(duì)項(xiàng)目做進(jìn)度成本管理工作是對(duì)企業(yè)提高技術(shù)和管理水平以及提升企業(yè)競爭能力具有十分重要的實(shí)踐意義。首先,詳細(xì)闡述項(xiàng)目管理中成本與進(jìn)度之間的關(guān)系以及列述項(xiàng)目管理中項(xiàng)目進(jìn)度與成本控制的研究方法與研究基礎(chǔ)。其次,主體部分以千島湖游艇建造項(xiàng)目為例,介紹千島湖游艇建造項(xiàng)目工程概況,同時(shí)了解千島湖游艇建造項(xiàng)目中各階段成本及各階段工期情況,然后分析千島湖游艇建造工程成本與進(jìn)度之間的關(guān)系,為后期,對(duì)千島湖游艇建造項(xiàng)目進(jìn)行合理的進(jìn)度計(jì)劃和成本計(jì)劃,同時(shí)進(jìn)一步對(duì)千島湖游艇建造項(xiàng)目進(jìn)行工作分解結(jié)構(gòu)(WBS),組織結(jié)構(gòu)設(shè)計(jì)、施工人員的責(zé)任分配矩陣以及各項(xiàng)工作持續(xù)時(shí)間的參數(shù)估計(jì),同時(shí)計(jì)算在目標(biāo)工期內(nèi)完工的概率以及繪制單代號(hào)網(wǎng)絡(luò)圖和甘特圖。再根據(jù)個(gè)項(xiàng)目的工程花費(fèi)對(duì)各項(xiàng)工作工程費(fèi)用、建造安裝工程費(fèi)用進(jìn)行計(jì)算等。然后,使用Microsoft Project 2010繪制千島湖游艇建造項(xiàng)目的跟蹤甘特圖和網(wǎng)絡(luò)計(jì)劃圖,同時(shí)對(duì)項(xiàng)目進(jìn)行掙值分析,之后分析項(xiàng)目的掙值結(jié)果,對(duì)項(xiàng)目提前或者落后的情況進(jìn)行排查,從而制定下階段的安排與任務(wù)。最后,對(duì)關(guān)鍵工作進(jìn)行合適的壓縮,同時(shí)建立CPM的進(jìn)度成本的優(yōu)化平衡模型中進(jìn)行優(yōu)化,根據(jù)優(yōu)化的結(jié)果重新編排進(jìn)度與成本的最適合的計(jì)劃。本論文的研究對(duì)一般游艇的建造以及大中型游艇工程建造項(xiàng)目的進(jìn)度成本計(jì)劃控制與優(yōu)化方面,有著一定的研究參考價(jià)值。
[Abstract]:China, following the United States and Europe, has become the third country to make yachts, and the largest potential market for yacht consumption. Under the fierce competition in the construction industry. Yacht construction units should constantly improve their own technology and management level. Before the implementation of the project, the project schedule cost planning, in the implementation of the project in time to face the reality of the optimization measures, in the optimization. Fully consider the characteristics of the project itself, enhance the pertinence and practicability of the optimization method, so. It is very important for enterprises to improve the technology and management level and enhance the competitiveness of enterprises to do the project schedule cost management. First of all. The relationship between cost and schedule in project management and the research methods and research basis of project schedule and cost control in project management are described in detail. Secondly, the main part takes the yacht construction project of Qiandao Lake as an example. This paper introduces the general situation of the yacht construction project in Qiandao Lake, and at the same time understands the cost of each stage and the time limit of each stage in the construction project of the yacht in Qiandao Lake, and then analyzes the relationship between the construction cost and the progress of the yacht construction in Qiandao Lake. For the later period, the reasonable progress plan and cost plan are carried out on the construction project of Qiandao Lake yacht. At the same time, the work decomposing structure and organizational structure design of the yacht construction project of Qiandao Lake are further carried out. The responsibility allocation matrix of the construction personnel and the parameter estimation of the duration of each work. At the same time, calculate the probability of completion within the target period and draw single code network diagram and Gantt chart. Then according to the cost of each project, the cost of construction and installation works are calculated. Then. Using Microsoft Project 2010 to draw the tracking Gantt chart and network plan of the Thousand Island Lake Yacht Construction Project, and carry on the earned value analysis to the project at the same time. After the analysis of the earned value of the project results, the project ahead of schedule or backward situation to investigate, so as to formulate the next stage of the arrangements and tasks. Finally, the key work for appropriate compression. At the same time, the optimization equilibrium model of schedule cost of CPM is established. According to the results of optimization rearrange the schedule and cost of the most suitable plan. This paper studies the construction of general yachts as well as large and medium-sized yacht construction project schedule cost control and optimization aspects. It has certain research reference value.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F426.474;F406.72

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 岳軍;;地鐵運(yùn)營安全風(fēng)險(xiǎn)管理現(xiàn)狀分析[J];黑龍江科技信息;2013年34期

2 羅石峰;;鐵路建設(shè)工程招標(biāo)投標(biāo)發(fā)展及現(xiàn)狀探討[J];鐵路工程造價(jià)管理;2008年02期

3 姜慧;董非;殷惠光;;施工企業(yè)項(xiàng)目成本控制體系的建立與應(yīng)用[J];常熟理工學(xué)院學(xué)報(bào);2007年10期

4 肖輝;;淺談施工企業(yè)項(xiàng)目成本控制與施工索賠[J];山西建筑;2007年29期

5 單汨源;龍穎;;一種關(guān)鍵鏈緩沖機(jī)制改進(jìn)方法及其應(yīng)用研究[J];項(xiàng)目管理技術(shù);2006年09期

6 甘裕新;;企業(yè)定額的完善與應(yīng)用管理[J];鐵路工程造價(jià)管理;2006年01期

7 劉U,

本文編號(hào):1454878


資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/gongshangguanlilunwen/1454878.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶da5e8***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com