天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 法律論文 > 經(jīng)濟(jì)法論文 >

船舶建造中遲延交船法律問題研究

發(fā)布時(shí)間:2018-06-01 23:42

  本文選題:船舶建造 + 遲延交船; 參考:《大連海事大學(xué)》2015年碩士論文


【摘要】:船舶制造業(yè)是一個(gè)資金密集型產(chǎn)業(yè),船舶造價(jià)高、周期長,造船合同通常具有國際性。由于實(shí)際情況的復(fù)雜性、對(duì)于條款理解的差異,往往導(dǎo)致爭(zhēng)議的產(chǎn)生。在絕大多數(shù)的造船合同案件中,都會(huì)存在遲延交付的問題。在SAJ Form、NEWBUILDCON Form和上海格式中均有對(duì)交船和遲延交船的規(guī)定。然而這些條款的不全面使得實(shí)踐中關(guān)于遲延交船的爭(zhēng)議時(shí)有發(fā)生。從近些年的案件中來看,關(guān)于遲延交船的構(gòu)成與否、具體遲延時(shí)間的確定以及買方的救濟(jì)方式這三方面的爭(zhēng)議最為常見。本文除引言和結(jié)論外,共分為四章。第一章分析了造船合同的特點(diǎn)和性質(zhì):同時(shí)也介紹了作為本文論述基礎(chǔ)的三大標(biāo)準(zhǔn)合同格式:SAJ Form、NEWBUILDCON Form和上海格式,通過對(duì)標(biāo)準(zhǔn)合同條款的分析,對(duì)遲延交船作出界定,在實(shí)際交船期晚于合同交船期時(shí),建造方交船構(gòu)成遲延。第二章從導(dǎo)致遲延交船的原因出發(fā),分析了在單一原因和多種原因?qū)е逻t延交船的情況下確定延誤時(shí)間的具體方法:在單一原因造成遲延交船時(shí),可運(yùn)用關(guān)鍵路徑分析法,找出造成遲延的原因;在多種原因造成遲延交船時(shí),結(jié)合中英兩國法院的具體做法,應(yīng)考慮適用分?jǐn)傄?guī)則,對(duì)各個(gè)原因造成的遲延逐一分析,根據(jù)其重要程度和責(zé)任比例進(jìn)行分?jǐn)?在扣除造船合同可允許的推遲事件造成延誤的時(shí)間后,最后得到的就是建造方遲延交船的具體時(shí)間。第三章從標(biāo)準(zhǔn)合同格式的規(guī)定入手,分析了延誤通知作為建造方主張順延合同交船期的前提條件的合理性,從而進(jìn)一步對(duì)延誤通知的構(gòu)成要件和法律后果進(jìn)行了研究。第四章分析了遲延交船時(shí)買方的兩種救濟(jì)方式:議定賠償和合同解除權(quán),對(duì)兩種方式的具體適用進(jìn)行了深入探討和分析:議定賠償具備補(bǔ)償性,在適用議定賠償條款時(shí)應(yīng)注意限制條件。買方解除合同后,既可以要求建造方返還預(yù)付的船款及利息、供應(yīng)品,也可以主張損害賠償,要求建造方賠償因遲延交船導(dǎo)致買方遭受的直接利益和間接利益的損失。
[Abstract]:Shipbuilding is a capital-intensive industry with high cost and long cycle. Shipbuilding contracts are usually international. Due to the complexity of the actual situation, differences in understanding of the terms often lead to disputes. In most shipbuilding contract cases, there will be delay in delivery. In the SAJ form neBUILDCON Form and Shanghai format, there are provisions for delivery and delayed delivery. However, due to the incompleteness of these clauses, disputes about delayed delivery of ships occur from time to time in practice. According to the cases in recent years, the disputes about the constitution of the delayed delivery ship, the determination of the specific delay time and the buyer's remedy are the most common disputes. In addition to the introduction and conclusions, this paper is divided into four chapters. The first chapter analyzes the characteristics and properties of shipbuilding contract. At the same time, it introduces three major standard contract formats: SAJ form and Shanghai format. Through the analysis of standard contract terms, the delay ship is defined. When the actual delivery date is later than the contract delivery date, the construction ship delivery constitutes delay. In the second chapter, starting from the causes of delay in delivery, the author analyzes the specific methods of determining the delay time in the case of single cause and multiple reasons. When the single cause causes delay, the critical path analysis method can be used. To find out the causes of the delay; in the case of delays in the delivery of ships due to various causes, and in the light of the specific practice of the courts of China and the United Kingdom, consideration should be given to the application of the rules of assessment to analyse the delays caused by each reason one by one. According to the degree of importance and the proportion of responsibility, after deducting the time of delay caused by the postponement of shipbuilding contract, the time of delay in delivery of the ship by the builder is obtained. The third chapter starts with the standard contract format and analyzes the rationality of the delay notice as the prerequisite condition for the constructor to insist on the extension of the contract delivery date, and further studies the constitutive requirements and legal consequences of the delay notice. The fourth chapter analyzes two kinds of remedies for the buyer when the ship is delayed: the right to agree compensation and the right to terminate the contract. The specific application of the two methods is discussed and analyzed in depth: the agreed compensation is compensatory. When applying the agreed compensation clause, attention should be paid to the restrictions. After the termination of the contract, the buyer may either require the builder to return the prepaid ship and interest, supplies, or claim damages for the loss of direct and indirect interests suffered by the buyer as a result of the delay in delivery of the ship.
【學(xué)位授予單位】:大連海事大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:D922.294;D923.6

【參考文獻(xiàn)】

相關(guān)期刊論文 前3條

1 劉華;田園;;合同違約救濟(jì)的比較研究[J];經(jīng)濟(jì)導(dǎo)刊;2010年12期

2 李升江;;新造船市場(chǎng)是否會(huì)二次探底[J];中國船檢;2011年08期

3 單紅軍;于詩卉;;非單一性:船舶建造合同法律屬性之特征[J];中國海商法年刊;2010年04期

相關(guān)碩士學(xué)位論文 前1條

1 魏來;BIMCO標(biāo)準(zhǔn)新造船合同法律問題研究[D];哈爾濱工程大學(xué);2012年

,

本文編號(hào):1966246

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/falvlunwen/jingjifalunwen/1966246.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a1e69***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com